GE H
EALTHCARE
VIVID FIVE
D
IRECTION
5341787-100, R
EVISION
8
B
ASIC
S
ERVICE
M
ANUAL
3 - 8
Section 3-5 - Completing the Installation
Section 3-5
Completing the Installation
3-5-1
Power On / Boot Up
NOTE:
After turning off a system, wait at least ten seconds before turning it on again. The system may not be
able to boot if power is recycled too quickly.
3-5-1-1
Scanner Power On
When power is applied to the scanner, power is distributed to the Cooling Unit, Control Panel, LCD,
Peripherals and the Back-end Processor.
3-5-1-2
Turn on the system
Press the
Power On/Off
switch at the front of the system once.
When the
Power On/Off
switch on the Control Panel is pressed once, the Back-end Processor starts
and the software code is distributed to initiate the scanner.
No status messages are displayed during this process.
3-5-2
Power Off/ Shutdown
NOTE:
After turning off a system, wait at least ten seconds before turning it on again. The system may not be
able to boot if power is recycled too quickly.
3-5-2-1
Back-end Processor Power Down
To power down the system:
1.) Press the
Power On/Off
switch once.
Figure 3-4 Power On/Off Switch
Summary of Contents for 5346769
Page 1: ...GE Healthcare LOGIQ C3 C5 Premium Basic Service Manual Part Number 5341787 100 Revision 8 ...
Page 2: ......
Page 167: ......