17/46
EN
TIPS AND RECOMMENDATIONS!
•
Some packages may bear labels with storage information that extends beyond these requirements. These
notes should be observed accordingly.
INSTALLATION AND INITIAL START-UP
6.1 SAFETY NOTES FOR INSTALLATION AND INITIAL START-UP
Staff
Installation and initial start-up of the system may only be performed by qualified staff.
6.2 PREPARATION
Unpacking
•
The system components should be removed from their packaging carefully and prudently.
•
Additional protective packaging should also be removed.
•
Check all components of damages from transport
Depressurize
•
Depressurize components and purge with inert gas if necessary
•
Cut tubing with special tool; avoid contaminations (dirt, cuttings, etc.)
•
Check perfect condition of components and purity of connections
6.3 INSTALLATION
The back plate of the panel is mounted at the above mentioned height. The front plate is suspend in the back
plate and secured with the delivered screw below in the middle.
The panel is mounted with compression fittings at process inlet, process outlet, relief valve and purge outlet
(if existent). First remove the plastic caps from all connections. The piping has to be insert completely into
the compression fitting. Than screw the nut hand tight. After that screw with a jaw spanner 1 ¼ turns tight.
Connect the relief tubing the same way. It is not allowed to connect relief and purge tubing. They had to go
separately and safe to the outside
TIPS AND RECOMMENDATIONS!
•
To connect the gas cylinder to the panel coils and flexible hoses are suitable (available accessories)
•
The stainless steel coils or flexible hose is always delivered separately. The correct allocation has to be
proved. At the connection nut you can see the type of cylinder connection. There is only one design of
coil/ hoses to connect it at the right and left side of panel.
•
To mount the coil/ hose please remove plastic caps from the thread. Make sure that the gasket, which is
scope of delivery, is inserted. Connect the nut with the inlet of the panel hand tight and afterwards screw
with a jaw spanner.
•
To connect the coil/hose with the gas cylinder, the thread of the cylinder valve and of the nut need to be in
perfect condition. Any time you connect new gas cylinder, use new cylinder connection.
•
Only coils and hoses from manufacturer suitable for used gases have to be used. Check gasket or correct
position in connection thread of coil/hose. Using a spanner extension is not allowed, it can cause damage
of thread and gasket and leads to leakage.
6.4 REQUIRED QUALIFICATIONS FOR INITIAL START-UP AND CYLINDER
CHANGING
•
The test protocols from the piping according to tightness and if necessary moisture and particles are
available
•
Process gas tubing, vent piping and purge gas tubing is connected
•
In process gas tubing is only standard gas ( see 1.2)
•
The start-up is only realized by qualified personal
•
Wear safety clothes according to regulations
•
Use spark-free tools and provide before installation
•
Before first start-up check type label, if the gas supply panel is suitable for the provided purpose (gas,
pressure, material, etc.)
6.