Operation
ORCA-III Operation Manual
GBC Pro-Tech 1997 October
3-8
(QFDSVXODWLRQ
6HWXS
1.
See process chart 3-4 and diagram 3-4b.
2.
Shims: None.
3.
Front Laminating Roll Pressure: 80 PSI
(550 kPa).
4.
Back Pull Roll Clutch Pressure: On, 80 PSI
(550 kPa).
5.
Pull Roll: Down, Pressure - 80 PSI (550 kPa).
6.
Speed: 5-7 fpm (150-210 cpm).
7.
Upper Laminator Roll Heat: 220-230 °F
(104-110 °C).
8.
Lower Laminator Roll Heat: 220-230 °F
(104-110 °C).
9.
Cooling: Optional
10.
Use of the rear wind-up roll for the finished
material is optional. It is a good procedure for
long runs.
3URFHGXUH
Feed the work into the nip with the leading edge tight
and entering the nip evenly from side to side. For thin
paper from electrostatic printers in roll form it is best
to fold over the leading edge approximately 6 inches
to create a square leading edge.
(QFDSVXODWLRQ :LWK (QYHORSH
)HHG
The use of the envelope feed feature greatly
simplifies the input of large hand-fed prints. The
procedure is identical to that for regular
encapsulation (see above), however, the machine
setup is different as shown in process chart 2-5 and
diagram 2-5B
7ZR3DVV 0RXQW DQG /DRW
DQG &ROG
There are several approaches to the mount/laminate
task. It can be accomplished with either hot or cold
laminate film on the top. Also, the second pass for
mounting can be done by feeding from either the front
or back of the laminator.
6HWXS
1.
See process charts 3-5, 3-6, 3-7, and 3-8 and
diagrams 3-5b, 3-6b, 3-7b, and 3-8b for film
mounting instructions and machine adjustments.
2.
Ensure that the mounting film from the bottom
side has the sticky (adhesive) side riding up
around the outside of the bottom laminating roll.
3URFHGXUH 3DVV
1.
Run the print through to apply adhesive and
laminate.
2.
Trim to slightly larger than the desired finished
size.
3URFHGXUH 3DVV
1.
Prepare to put the print through a second time to
mount the print to the substrate - anything from
wood, to Masinote, to Gator foam. Start by
setting the shims to the appropriate spacing for
the material used.
2.
Trim the board to the size of the print.
3.
Align the work to the board and ensure an exact
fit. Place weights on the center of the print to
make sure that it does not move relative to the
board during the next steps.
4.
Raise one end of the print and peel back
approximately two inches of the liner to expose
the adhesive that was applied to the print in the
first pass. Fold it under.
5.
Lay the print back down evenly and extremely
flat. From the center outward, tack the exposed
adhesive to the substrate.
6.
Position the piece so that the end with the liner
peeled back is facing the nip. Insert the first one
inch of the board into the nip. Very carefully
wrap the print back and over the top laminating
roll. Be sure there are no wrinkles in the nip area.
Carefully peel off the liner as the board
progresses through the laminator.
7.
Trim the piece to the finished size.
Summary of Contents for OORCA-III
Page 19: ...Installation ORCA III Operation Manual GBC Pro Tech 1997 October 2 8 Blank Page ...
Page 57: ...Operation ORCA III Operation Manual GBC Pro Tech 1997 October 3 38 Blank page ...
Page 71: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 5 2 Blank page ...
Page 74: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 3 ...
Page 75: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 4 ...
Page 76: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 5 ...
Page 77: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 6 ...
Page 78: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 7 ...
Page 79: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 8 ...
Page 80: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 9 ...
Page 81: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 10 ...
Page 82: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 11 ...
Page 83: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 12 ...
Page 84: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 13 ...
Page 85: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 14 ...
Page 86: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 15 ...
Page 87: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 16 ...
Page 88: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 17 ...
Page 89: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 18 ...
Page 90: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 19 ...
Page 91: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 20 ...
Page 92: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 21 ...
Page 93: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 22 ...
Page 94: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 23 ...
Page 95: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 24 ...
Page 96: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 25 ...
Page 97: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 26 ...
Page 98: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 27 ...
Page 99: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 28 ...
Page 100: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 29 ...
Page 101: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 30 ...
Page 102: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 31 ...
Page 103: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 32 ...
Page 104: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 33 ...
Page 105: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 34 ...
Page 106: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 35 ...
Page 107: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 36 ...