Installation
ORCA-III Operation Manual
GBC Pro-Tech 1997 October
2-4
8QSDFNLQJ
⇒
NOTE
ALL SHIPMENTS ARE EX- WORKS. At our dock
title passes to the buyer. Please review your
insurance coverage prior to shipment, as you are
responsible for all subsequent freight charges and
risks. Before signing the Bill of Lading you should
be sure to inspect the crate and/or pallet for signs of
damage or missing items; if applicable, make a note
of this on the Bill of Lading.
WARNING
The unpacking process requires at least two
people. You can be severely injured or
crushed.
Tools required:
•
Phillips head screwdriver
•
7
/
8
" open end wrench or adjustable wrench
To uncrate the laminator:
1.
Remove the top of the crate and then the sides in
the order shown in Figure 2-2.
CAUTION
Do not allow the top to fall into the crate. It
can damage the laminator.
Do not put packing screws on the floor. They
can cause problems when trying to roll the
machine into position.
A second person must support the side labeled
5 in Figure 3-4. It can fall and damage the
laminator.
5
4
2
Install
Screws
by Pro-T
ech
To
be ser
viced onl
y
by
trained and
authoriz
ed per
sonnel.
Loc
kout po
wer bef
ore
ser
vicing.
HAZARDOUS
VO
LT
AG
E.
DANGER
GEF
AHR
©1
99
4 H
az
ar
d C
om
m
un
ic
atio
n S
ys
te
m
s,
In
c. 8
00
-7
48
-02
41
Re
ord
er
N
o. 50
25
-P
T
NO
T
AU
S
EMERG
E
N
C
Y
S
TOP
AR
RE
TD
'U
RG
E
N
C
E
NO
T
AU
S
EMERG
E
N
C
Y
S
TOP
AR
RE
TD
'U
RG
E
N
C
E
NOT AUS
EM
E
R
G
E
N
CY
ST
OP
AR
RE
TD
'U
R
G
E
N
CE
NOT AUS
EM
E
R
G
E
N
CY
ST
OP
AR
RE
TD
'U
R
G
E
N
CE
15
20
25
30
ST
OP
AUT
O
SPEED
0
3
6
9
12
15
18
FWD
REV
PO
WER
FA
N
1
O
1
O
HEA
T
ROLL
PRESSURE
ADJ
B
O
T
T
O
M
MOT
OR CONTROLS
PRO
-TE
CH E
ngineering M
adiso
n,W
I 608-246
-8844
LAMINA
TOR ROLL
CONTROLS
T
O
P
20
100
40
80
3
1
Figure 2-2:
Removing the Crate
2.
Carefully unwrap the shrink wrap from around
the laminator.
CAUTION
Do not use a knife or other sharp instrument
during installation or while servicing the
laminator. You can cause irreparable damage
to the rolls.
3.
Carefully remove any accessories packed with
the laminator. The accessory pack should
contain:
1 Set, hex wrenches
1
5
/
16
" T-handle wrench
1 Slitting knife
1 Manual
1 Set, spare fuses
1 Air line quick-couple connector, female
100% white cotton terry rags
4.
Have the laminator rolled off the skid and placed
on the floor by licensed riggers. The ramps
included with the laminator can be secured to the
edge of the crate bottom using the screws left
over from the crate disassembly (see Figure 2-2).
Summary of Contents for OORCA-III
Page 19: ...Installation ORCA III Operation Manual GBC Pro Tech 1997 October 2 8 Blank Page ...
Page 57: ...Operation ORCA III Operation Manual GBC Pro Tech 1997 October 3 38 Blank page ...
Page 71: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 5 2 Blank page ...
Page 74: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 3 ...
Page 75: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 4 ...
Page 76: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 5 ...
Page 77: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 6 ...
Page 78: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 7 ...
Page 79: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 8 ...
Page 80: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 9 ...
Page 81: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 10 ...
Page 82: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 11 ...
Page 83: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 12 ...
Page 84: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 13 ...
Page 85: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 14 ...
Page 86: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 15 ...
Page 87: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 16 ...
Page 88: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 17 ...
Page 89: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 18 ...
Page 90: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 19 ...
Page 91: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 20 ...
Page 92: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 21 ...
Page 93: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 22 ...
Page 94: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 23 ...
Page 95: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 24 ...
Page 96: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 25 ...
Page 97: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 26 ...
Page 98: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 27 ...
Page 99: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 28 ...
Page 100: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 29 ...
Page 101: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 30 ...
Page 102: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 31 ...
Page 103: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 32 ...
Page 104: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 33 ...
Page 105: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 34 ...
Page 106: ...ORCA III Operation Manual Technical Information GBC Pro Tech 1997 October 6 35 ...
Page 107: ...Technical Information ORCA III Operation Manual GBC Pro Tech 1997 October 6 36 ...