52
I
HEAT
The “READY” indicator may
extinguish if the speed is set too
fast for the material being laminated.
Either lower the speed setting or
press STOP
and wait until the
“READY” indicator illuminates.
Operation of the laminator for more
than thirty minutes at a time may
necessitate a lower speed setting.
It is recommended that, during
periods of long runs, the items
being laminated are alternated
between thick and thin. Do not
combine thick and thin items
at the same time, as this will
result in a poor edge seal
around the thinner material. If
you are unsure that the laminator is
set at the proper speed for the item
to be laminated, run a test piece
(scrap) of the same or similar
material through the laminator. This
procedure is recommended
because rotating the heat roller
prior to lamination will more evenly
distribute the heat. Make speed
adjustments if necessary.
OUTPUT
1. “D” waves in the image
(Figure 45 A).
– Check paper tension.
– Paper may be damp or not dry.
2. “D” waves in the laminate
(Figure 45 B).
– Check main roller pressure.
– Check pull roller pressure.
3. Straight waves in output
(Figure 46 A).
– Check operational settings for
materials being used.
– Check clutch tension.
4. Indent waves in output after
pull rollers (Figure 46 B).
– Insufficient cooling time.
– Output was handled prior to
cooling.
– Use cooling feature if not on.
– Machine was stopped on print.
5. Angled waves in the output
(Figure 47 A & B).
– Main air supply setting.
– Check main roller pressure.
– Check pull roller pressure.
– Check for even paper tension.
(Figure 49 A only)
Fig. 45
Fig. 46
Fig. 47
- A -
- B -
- A -
- B -
- A -
- B -
Preliminary
Copy
Summary of Contents for Falcon 60+ (-1)
Page 2: ...2 Preliminary Copy...
Page 5: ...5 NL F E Preliminary Copy...
Page 7: ...7 NL F E Preliminary Copy...
Page 9: ...9 NL F E Preliminary Copy...
Page 11: ...11 NL F E Preliminary Copy...
Page 13: ...13 NL F E Preliminary Copy...
Page 15: ...15 D NL F E Preliminary Copy...
Page 17: ...17 D NL F E Preliminary Copy...
Page 19: ...19 D NL F E Preliminary Copy...
Page 21: ...21 D NL F E Preliminary Copy...
Page 23: ...23 D NL F E Preliminary Copy...
Page 25: ...25 D NL F E Preliminary Copy...
Page 27: ...27 D NL F E Preliminary Copy...
Page 29: ...29 D NL F E Preliminary Copy...
Page 31: ...31 D NL F E Preliminary Copy...
Page 33: ...33 D NL F E Preliminary Copy...
Page 35: ...35 D NL F E Preliminary Copy...
Page 37: ...37 D NL F E Preliminary Copy...
Page 39: ...39 D NL F E Preliminary Copy...
Page 41: ...41 D NL F E Preliminary Copy...
Page 43: ...43 D NL F E Preliminary Copy...
Page 45: ...45 D NL F E Preliminary Copy...
Page 47: ...47 D NL F E Preliminary Copy...
Page 51: ...51 NL F E Preliminary Copy...
Page 53: ...53 D NL F E Preliminary Copy...
Page 55: ...55 NL F E Preliminary Copy...
Page 57: ...57 I Preliminary Copy...
Page 58: ...58 D Preliminary Copy...
Page 59: ...59 NL Preliminary Copy...
Page 60: ...60 F Preliminary Copy...
Page 61: ...61 E Preliminary Copy...
Page 62: ...62 This page intentionally left blank Preliminary Copy...
Page 63: ...Preliminary Copy...
Page 64: ...General Binding Corporation One GBC Plaza Northbrook IL 60062 4195 Preliminary Copy...