34
I
WEBBING PSA FILM/ MOUNT
ADHESIVE USING THREADING
CARD
The laminator should be cool to the
touch before proceeding.
1. Turn the Power ON/OFF to on
(I).
2. Load the rolls of film as
illustrated in Figure 25. Ensure
no brake tension is applied to the
film shafts.
3. Remove the safety shield and
pivot the feed table down.
3. Pull the top roll of film down
under the idler bar and up to the
upper front rewind tube.
4. Place one piece of masking tape
in the center of the film and
secure to the rewind tube.
5. Make two full wraps around the
rewind tube, then carefully
score the laminate without
cutting the release liner. Pull the
laminate down allowing it to
drape over the upper heat roller
(Figure 25).
7. Pull the mount adhesive up
towards the film draped over the
upper heat roller (Figure 26).
8. Use a threading card to push the
two materials through the heat
roller nip.
9. Pivot the table back to it’s
feeding position while ensuring
the threading card is on top of
the feed table (Figure 27).
10. Replace the safety shield.
11. Use the main roller pressure
handle to bring the main roller to
initial contact with the threading
card.Set speed to 3 or less.
12. Set speed to 3 or less. Ensure
foward ( ) is selected and
press the start (
) button.
13. From the rear of the machine,
guide the web over the chill idler,
if installed, and through the pull
rollers.
14. Once the web has entered the
pull roller nip, use the pull roller
pressure handle to close the pull
roller nip.
15. Press the stop (
) button
Once the threading card has
completely exited the pull
rollers,.
16. Open the main roller nip.
17. Now refer to the section
entitled
START LAMINATING.
Fig. 25
Fig. 26
Fig. 27
PSA
Film
Mount
Adhesive
PSA
Film
Mount
Adhesive
PSA
Film
Mount
Adhesive
Preliminary
Copy
Summary of Contents for Falcon 60+ (-1)
Page 2: ...2 Preliminary Copy...
Page 5: ...5 NL F E Preliminary Copy...
Page 7: ...7 NL F E Preliminary Copy...
Page 9: ...9 NL F E Preliminary Copy...
Page 11: ...11 NL F E Preliminary Copy...
Page 13: ...13 NL F E Preliminary Copy...
Page 15: ...15 D NL F E Preliminary Copy...
Page 17: ...17 D NL F E Preliminary Copy...
Page 19: ...19 D NL F E Preliminary Copy...
Page 21: ...21 D NL F E Preliminary Copy...
Page 23: ...23 D NL F E Preliminary Copy...
Page 25: ...25 D NL F E Preliminary Copy...
Page 27: ...27 D NL F E Preliminary Copy...
Page 29: ...29 D NL F E Preliminary Copy...
Page 31: ...31 D NL F E Preliminary Copy...
Page 33: ...33 D NL F E Preliminary Copy...
Page 35: ...35 D NL F E Preliminary Copy...
Page 37: ...37 D NL F E Preliminary Copy...
Page 39: ...39 D NL F E Preliminary Copy...
Page 41: ...41 D NL F E Preliminary Copy...
Page 43: ...43 D NL F E Preliminary Copy...
Page 45: ...45 D NL F E Preliminary Copy...
Page 47: ...47 D NL F E Preliminary Copy...
Page 51: ...51 NL F E Preliminary Copy...
Page 53: ...53 D NL F E Preliminary Copy...
Page 55: ...55 NL F E Preliminary Copy...
Page 57: ...57 I Preliminary Copy...
Page 58: ...58 D Preliminary Copy...
Page 59: ...59 NL Preliminary Copy...
Page 60: ...60 F Preliminary Copy...
Page 61: ...61 E Preliminary Copy...
Page 62: ...62 This page intentionally left blank Preliminary Copy...
Page 63: ...Preliminary Copy...
Page 64: ...General Binding Corporation One GBC Plaza Northbrook IL 60062 4195 Preliminary Copy...