18
I
INSTALLATION
1. Shipping damage should be
brought to the immediate
attention of the delivering
carrier.
2. With assistance, carefully roll
the laminator into position over
flat and even surfaces.
3. The laminator should be
positioned to allow exiting film to
flow freely to the floor (Figure 3)
or a work table. Accumulation of
laminate immediately behind the
laminator as it exits the
equipment may cause the film to
wrap around the pull rollers,
resulting in a “jammed” condition.
4. Avoid locating the laminator near
sources of heat or cold. Avoid
locating the laminator in the
direct path of forced, heated or
cooled air.
5. Leveling of the machine is a
customer option. If you choose
not to level the laminator and
encounter output problems,
please level the machine and try
your application again before
calling for technical support.
Resting the laminator on the
leveling pads prevent the
machine from rolling during set
up, operation or servicing.
(Figure 4)
6. Connect the attachment plug
provided with the laminator to a
suitably grounded outlet. Avoid
connecting other equipment
to the same branch circuit to
which the laminator is
connected, as this may
result in nuisance tripping
of circuit breakers or
blowing fuses.
Fig. 3
Fig. 4
Fig. 5
x 4
Preliminary
Copy
Summary of Contents for Falcon 60+ (-1)
Page 2: ...2 Preliminary Copy...
Page 5: ...5 NL F E Preliminary Copy...
Page 7: ...7 NL F E Preliminary Copy...
Page 9: ...9 NL F E Preliminary Copy...
Page 11: ...11 NL F E Preliminary Copy...
Page 13: ...13 NL F E Preliminary Copy...
Page 15: ...15 D NL F E Preliminary Copy...
Page 17: ...17 D NL F E Preliminary Copy...
Page 19: ...19 D NL F E Preliminary Copy...
Page 21: ...21 D NL F E Preliminary Copy...
Page 23: ...23 D NL F E Preliminary Copy...
Page 25: ...25 D NL F E Preliminary Copy...
Page 27: ...27 D NL F E Preliminary Copy...
Page 29: ...29 D NL F E Preliminary Copy...
Page 31: ...31 D NL F E Preliminary Copy...
Page 33: ...33 D NL F E Preliminary Copy...
Page 35: ...35 D NL F E Preliminary Copy...
Page 37: ...37 D NL F E Preliminary Copy...
Page 39: ...39 D NL F E Preliminary Copy...
Page 41: ...41 D NL F E Preliminary Copy...
Page 43: ...43 D NL F E Preliminary Copy...
Page 45: ...45 D NL F E Preliminary Copy...
Page 47: ...47 D NL F E Preliminary Copy...
Page 51: ...51 NL F E Preliminary Copy...
Page 53: ...53 D NL F E Preliminary Copy...
Page 55: ...55 NL F E Preliminary Copy...
Page 57: ...57 I Preliminary Copy...
Page 58: ...58 D Preliminary Copy...
Page 59: ...59 NL Preliminary Copy...
Page 60: ...60 F Preliminary Copy...
Page 61: ...61 E Preliminary Copy...
Page 62: ...62 This page intentionally left blank Preliminary Copy...
Page 63: ...Preliminary Copy...
Page 64: ...General Binding Corporation One GBC Plaza Northbrook IL 60062 4195 Preliminary Copy...