Post-Installation Configuration & Checkout
GNS 480 (CNX80) Installation Manual
560-0982-01 Rev L
3-19
3.3
Equipment Operational/Functional Test
Following equipment configuration, use the GNS 480 Test Function (3.3.1.1) and Interface Monitor
Function (3.3.1.2) as necessary to verify that the interfaces are wired correctly. Once the wiring is
verified, perform the System Checkout (3.3.2).
3.3.1
GNS 480 Checkout Utilities
3.3.1.1
Test Function
The Test function allows the checkout of the display, controls, and I/O of the GNS 480. While in the
Ground Maintenance mode, press the
TEST
smart key to enter the Test menu, which is shown in the top
part of Figure 3-18. Additional items on the TEST menu (shown in the bottom part of Figure 3-18) are
available by pressing the
NEXT PAGE
line select key.
main page
second page
Figure 3-18. TEST Main Pages
Summary of Contents for GNS 480
Page 1: ...GNS 480 CNX80 Color GPS NAV COM Installation Manual November 2008 560 0982 01 Rev L...
Page 10: ...Table of Contents viii 560 0982 01 Rev L GNS 480 CNX80 Installation Manual Notes...
Page 32: ...General Information 1 22 560 0982 01 Rev L GNS 480 CNX80 Installation Manual Notes...
Page 80: ...Installation Procedures 2 48 560 0982 01 Rev L GNS 480 CNX80 Installation Manual Notes...
Page 134: ...Periodic Maintenance 6 2 560 0982 01 Rev L GNS 480 CNX80 Installation Manual Notes...
Page 158: ...Appendix D Interconnect Diagrams D 2 560 0982 01 Rev L GNS 480 CNX80 Installation Manual Notes...
Page 192: ...D 36 560 0982 01 Rev Notes...
Page 199: ......
Page 200: ......