background image

Part # 19009086 (01/31/08)

Page 5

INTRODUCTION

Uncrating

Garland strongly recommends this unit be inspected for 
possible freight damage now while carrier driver is on site.

1. Remove carton. In case of damage, all packaging 

materials must be retained for carrier inspection.

2. Inspect top, sides, front and rear with special attention to:

A. All knobs and dials in place?

B. Legs attached and square?

C. Body parts dented or scratched?

D. Check handles, tops and body paint for rub marks, 

scraps.

3. With carrier driver on your site, note damage on freight 

bill. Call carrier for inspection.

If you are checking equipment after carrier has departed, 
you have approximately fifteen (15 ) days to request a 
freight damage inspection be made by the carrier’s agent. If 
concealed damage claim is filed with carrier beyond 15 days, 
Garland cannot be held responsible and carrier will make it 
incumbent upon the consignee to offer reasonable evidence 
that the carrier was at fault.

Extended Warranty

With a tradition of superior equipment quality and 
performance, offers you, our valued customer, an additional 
one year limited warranty beyond our standard one year 
coverage.

This additional coverage for parts and labor may be 
purchased on a new equipment order or up to 60 days after 
the equipment purchase. Please contact your Equipment 
Dealer or Maintenance & Repair Center (list enclosed) to take 
advantage of this exceptional offer.

Thank you for using Garland products. It is our pleasure to 
serve you.

Rating Plate

When corresponding with the factory or your local 
authorized factory service center regarding service problems 
or replacement parts, be sure to refer to the particular unit 
by the correct model number (including the prefix and suffix 
letters and numbers) and the warranty serial number. The 
rating plate affixed to the unit contains this information.

INSTALLATION

Siting

Proper placement of the fryer will ensure operator and 
satisfactory performance. Adequate clearance must be 
provided for servicing, ventilation (if applicable), and 
proper operation. The fryer must be kept free and clear of 
combustible material.

Legs

All units are shipped with N.S.F. approved legs. These legs 
must be installed to provide clearance of 6” between the 
floor and bottom of the unit in order to meet National 
Sanitation foundation requirements.

1. Locate unit in its final position

2. Raise the rear and block it. Insert the bullet foot into the 

leg cone. Tap with mallet until the bullet foot seats up to 
the collar. Unit may now be leveled by adjusting hex head 
portion of the bullet foot. Repeat for all four legs.

3. All that remains is to install the automatic basket lift 

holders (if applicable).

Electrical Connection

Before attempting the electrical connection, the rating 
plate should be checked to ensure that the unit’s electrical 
characteristics and the supply characteristics agree. 

Summary of Contents for 36ES11

Page 1: ...24 0260 Fax 905 624 5669 Enodis UK LTD Swallowfield Way Hayes Middlesex UB3 1DQ ENGLAND Telephone 081 561 0433 Fax 081 848 0041 Part 1009086 01 31 08 2004 Garland Commercial Industries Inc FOR YOUR SA...

Page 2: ...ate of California to cause cancer and or birth defects or other reproductive harm Installation and servicing of this product could expose you to airborne particles of glass wool ceramic fibers Inhalat...

Page 3: ...r top Modular Models Rated Greater Than 48 Amperes 6 Counter Top Modular Models Rated Less Than 48 Amperes 7 Ventilation 7 OPERATION 7 Preparation Before Use 7 Proper Method of Filling the Fryer Tank...

Page 4: ...HREE PHASE X Y Y Z X Z 208 240 460 208 240 460 X Y Z X Y Z X Y Z 36ES11 36ES11BL 36ST11 680 31F 680 31FBL E24 31F 12 4 4 4 58 51 26 33 33 33 30 30 30 15 15 14 36ES11SF 36ES11 SFBL 36ET11SF 680 3SF 680...

Page 5: ...nance Repair Center list enclosed to take advantage of this exceptional offer Thank you for using Garland products It is our pleasure to serve you Rating Plate When corresponding with the factory or y...

Page 6: ...W T box cover and attach with two 2 fasteners Upon completion of power input supply connection test fryer for operation by following the procedure as described in the section Proper Method of Filling...

Page 7: ...uired Upon completion of power input supply connection test fryer for operation by following the procedure as described in the section Proper Method of Filling Fryer Tank Ventilation Proper ventilatio...

Page 8: ...een completed the gasket will be automatically raised out of the hot frying compound and will drain back into the tank OPERATION Continued FryersWith Manual Lift Baskets If your fryer is not equipped...

Page 9: ...ryer tank with the optional drain valve and the frying compound is in a fluid state you need merely place a vessel of the proper size in the compartment beneath the drain valve and open the valve When...

Page 10: ...a mild soap or detergent solution Although the electrical components are well shielded it would be wise to shut off the power to the fryer while using wet cloths or sponges Stainless Steel Stainless...

Page 11: ...produit pour friture pour rincer les r sidus et les miettes du bassin Jeter cette partie de produit Laver le bassin avec du savon du d tergent ou un produit sp cial pour bassin de friteuse En cas d u...

Page 12: ...tions Pour Obtenir Des Produits Frits De Qualit La propret de l quipement est essentielle pour obtenir des aliments de qualit Un produit pour friture frais et propre am liore la qualit du produit frit...

Page 13: ...lev e risque de faire br ler le produit Le voyant lumineux rouge s allume et reste allum jusqu ce que la temp rature soit atteinte Maintenir la temp rature de 200 F et ajouter du shortening jusqu ce q...

Page 14: ...tre connect s aux bornes dont les num ros correspondent aux num ros des bornes des disjoncteurs circuit de d rivation situ s dans le bo tier FWT paragraphe 7 ci dessus 11 V rifi er les branchements e...

Page 15: ...s surintensit s disjoncteur fusibles etc INSTALLATION suite REMARQUE Sectionner l instruction d installation suivante en fonction du mod le concern Mod les Base De Rangement La connexion lectrique int...

Page 16: ...porteur Garantie Prolong e Avec sa tradition de qualit et de performances de ses quipements vous off re vous son client une garantie limit e suppl mentaire d un an en plus de notre couverture standard...

Page 17: ...SE TROIS PHASES X Y Y Z X Z 208 240 460 208 240 460 X Y Z X Y Z X Y Z 36ES11 36ES11BL 36ST11 680 31F 680 31FBL E24 31F 12 4 4 4 58 51 26 33 33 33 30 30 30 15 15 14 36ES11SF 36ES11 SFBL 36ET11SF 680 3S...

Page 18: ...8 Amp res 6 Mod les Modulaires De Comptoir D une Puissance Inf rieure 48 Amp res 7 Ventilation 7 UTILISATION 8 Pr paration Avant Utilisation 8 M thode Correcte De Remplissage Du Bassin De Friture 8 Le...

Page 19: ...comme causant le cancer et ou des malformations cong nitales ou d autres probl mes de reproduction L installation et l entretien de ce produit peut vous exposer aux poussi res de laine de verre fibre...

Page 20: ...5669 Enodis UK LTD Swallowfi eld Way Hayes Middlesex UB3 1DQ ANGLETERRE T l phone 081 561 0433 T l copieur 081 848 0041 Pi ce n 1009086 01 31 08 2004 Garland Commercial Industries Inc POUR VOTRE S CU...

Reviews: