GAELCO - TOKYOCOP
19
BEFORE SWITCHING ON THE MACHINE, PLEASE CHECK THAT THE
INTALLATION FITS ALL THE REQUIREMENTS DESCRIBED ON CHAPTER
3 (SAFETY NOTES) AND ESPECIALLY THOSE OF SECTION 3.2
The installation of the machine at its final site should be carried out by trained people.
Mains power must be always be turned off, and the machine unplugged, before replacing
any part or handling connectors. Please check the following points again:
x
The area chosen for the machine is well away from heat sources.
x
The machine does not obstruct emergency exits.
x
The whole machine is level and stable on the floor. The leg levellers are secured in
place.
x
The power cord can be plugged into a grounded receptacle that provides the specified
voltage and frequency.
x
The mains supply is equipped with an Earth Leakage Breaker rated at 30mA.
The mains switch is located in the compact filter assembly, which also contains the fuse
and the socket for the mains cable. It is found in the back of the monitor cabinet.
To start the machine, push the switch to position "I".
The machine can be switched OFF (position "0") whenever necessary. If a game is in
progress on the machine, the credit will be lost.
To avoid possible damage to the electronic components, wait several seconds
before turning the machine on again.
5.3
GETTING READY TO START
5.4
SWITCHING ON THE MACHINE
Summary of Contents for TOKYOCOP
Page 4: ...GAELCO TOKYOCOP 4 ...
Page 34: ...GAELCO TOKYOCOP 34 ...
Page 57: ...GAELCO TOKYOCOP 57 ...
Page 59: ...GAELCO TOKYOCOP 59 ...
Page 61: ...GAELCO TOKYOCOP 61 ...
Page 66: ...GAELCO TOKYOCOP 66 ...
Page 67: ...GAELCO TOKYOCOP 67 11 1 POWER WIRING DIAGRAM 11 WIRING DIAGRAMS ...
Page 68: ...GAELCO TOKYOCOP 68 11 2 CABINET WIRING DIAGRAM ...
Page 69: ...GAELCO TOKYOCOP 69 11 3 UNION HARNESS WIRING DIAGRAM ...
Page 70: ...GAELCO TOKYOCOP 70 11 4 PLATFORM WIRING DIAGRAM ...
Page 71: ...GAELCO TOKYOCOP 71 11 5 DASHBOARD WIRING DIAGRAM ...
Page 72: ...GAELCO TOKYOCOP 72 11 6 COIN TOWER WIRING DIAGRAM ...