GAELCO - TOKYOCOP
14
It is best to unpack the machine where it is going to be used or in a place as near as
possible to this. Two people are needed to lift the cardboard packaging over the top of each
unit.
Once the packaging is removed, the machine looks as shown in the illustration.
Normally, GAELCO products are ready to assemble immediately after transporting to the
location. Nevertheless, some mishandling may occur during transportation. Check the
following points to ensure that the machine has been properly delivered:
x
Examine the cabinet exterior for dents, chips, or broken parts
x
Verify that castors and levellers are not damaged
x
Inspect the major assemblies, such as the video display monitor, handlebar and seat.
Make sure that they are mounted securely and that all ground wires are firmly
connected.
x
Ensure that the power supply voltage and frequency requirements meet those of the
location.
x
Ensure that the fuses already installed meet the specified rating and type.
x
Inspect the power cable to ensure that it is not damaged.
x
Verify that the keys delivered with the machine open all doors.
x
Check if all the accessories are included.
5.
UNPACKING, ASSEMBLING & INSTALLATION
5.1
INSPECTION BEFORE ASSEMBLING
Summary of Contents for TOKYOCOP
Page 4: ...GAELCO TOKYOCOP 4 ...
Page 34: ...GAELCO TOKYOCOP 34 ...
Page 57: ...GAELCO TOKYOCOP 57 ...
Page 59: ...GAELCO TOKYOCOP 59 ...
Page 61: ...GAELCO TOKYOCOP 61 ...
Page 66: ...GAELCO TOKYOCOP 66 ...
Page 67: ...GAELCO TOKYOCOP 67 11 1 POWER WIRING DIAGRAM 11 WIRING DIAGRAMS ...
Page 68: ...GAELCO TOKYOCOP 68 11 2 CABINET WIRING DIAGRAM ...
Page 69: ...GAELCO TOKYOCOP 69 11 3 UNION HARNESS WIRING DIAGRAM ...
Page 70: ...GAELCO TOKYOCOP 70 11 4 PLATFORM WIRING DIAGRAM ...
Page 71: ...GAELCO TOKYOCOP 71 11 5 DASHBOARD WIRING DIAGRAM ...
Page 72: ...GAELCO TOKYOCOP 72 11 6 COIN TOWER WIRING DIAGRAM ...