10. INSTALLATION
10-19
4)
Solder a ground wire to the shield.
5)
Dress the shield and the outer sheath with heat shrink tube, leaving 30 mm
of shield and outer sheath exposed.
6)
Heat the heat shrink tube.
7)
Remove the insulation of NH connector (supplied) 3 mm.
8)
Heat the heat shrink tube.
How to fabricate the signal cable
Summary of Contents for GP-150-Dual
Page 1: ...Dual GPS GP 150 DUAL OPERATOR S MANUAL www furuno co jp MODEL ...
Page 28: ...3 MARKS 3 4 This page is intentionally left blank ...
Page 36: ...4 NAVIGATION PLANNING 4 8 This page is intentionally left blank ...
Page 66: ...8 MENU SETTINGS 8 14 This page is intentionally left blank ...
Page 98: ...APPENDEX AP 4 World Time Standards ...
Page 117: ...D 1 ...
Page 118: ...D 2 ...
Page 119: ...D 3 ...
Page 120: ...Y Hatai hatai 2005 12 19 11 57 12 09 00 Dー4 ...
Page 121: ...Mar 27 07 R Esumi D 5 ...
Page 122: ...Feb 19 03 D 6 ...
Page 123: ...Feb 19 03 D 7 ...
Page 124: ...D 8 ...
Page 125: ...Jan 13 04 D 9 ...