10. INSTALLATION
10-20
Grounding
To prevent electrical shock and mutual interference, run a ground wire between
the earth terminal on the unit and ship’s superstructure.
Cabling schedules
The signal cable should be a twisted-pair, double-screened cable. Ground the
signal cable at the cable clamp.
Connections
Power supply
J1 (24 VDC)
Pin no.
Designation
#1 +
#2 -
Input signal (NMEA)
The signal from GPS navigator is connected to J2 and J3. Data being fed to J2
has higher priority than J3.
J2 J3
Pin no.
Designation
Pin no.
Designation
#3
RD1-H #3 RD2-H
#4
RD1-C #4 RD2-C
#6
GND #6 GND
Output signal (RS-422 or NMEA)
J4, J5, J6, J7, J8, J9
Pin no.
RS-422
NMEA
#1 TD-B TD-H
#2 TD-A TD-C
#4* GND GND
*#5 for J9
Summary of Contents for GP-150-Dual
Page 1: ...Dual GPS GP 150 DUAL OPERATOR S MANUAL www furuno co jp MODEL ...
Page 28: ...3 MARKS 3 4 This page is intentionally left blank ...
Page 36: ...4 NAVIGATION PLANNING 4 8 This page is intentionally left blank ...
Page 66: ...8 MENU SETTINGS 8 14 This page is intentionally left blank ...
Page 98: ...APPENDEX AP 4 World Time Standards ...
Page 117: ...D 1 ...
Page 118: ...D 2 ...
Page 119: ...D 3 ...
Page 120: ...Y Hatai hatai 2005 12 19 11 57 12 09 00 Dー4 ...
Page 121: ...Mar 27 07 R Esumi D 5 ...
Page 122: ...Feb 19 03 D 6 ...
Page 123: ...Feb 19 03 D 7 ...
Page 124: ...D 8 ...
Page 125: ...Jan 13 04 D 9 ...