2. WIRING
2-15
2.8
Control Box of Hull Unit
Connect the 3 phase power cable and the transceiver unit cable (10S2078) as shown
below.
Confirm that the LED lights in red after the wiring is completed. If the LED does not
light, turn off power cable from the mains switchboard, reconnect any two lines of the
power cable, turn on the power, and check if the LED lights. The hull unit does not
work when the connection is wrong.
Normal phase: LED lights in red. Phase reversal: LED does not light.
Fabricate the power cable as shown below.
CN-C101
TB-C101
Connect the power cable to this terminal board.
LED (red)
For detection of phase reversal on 3 phase power cable
Connect the transceiver
cable (10S2078) here.
Cable (10S2078) from
transceiver unit
Power cable
(TPYCY-4)
Armor
Anticorrosive
sheath
100
25
20
Set armor in
clamp.
Vinyl sheath
FV5.5-4
M4 (YEL) x 3
Sheath
Vinyl
sheath
Conductor
S=4mm
2
φ
=2.55 mm
Dimensions in
millimeters
φ
=16.9 mm
Summary of Contents for FSV-35
Page 22: ...1 HOW TO INSTALL THE SYSTEM 1 16 This page is intentionally left blank ...
Page 55: ...D 1 13 Sep 2011 Y NISHIYAMA ...
Page 56: ...D 2 13 Sep 2011 Y NISHIYAMA ...
Page 57: ...D 3 5 Nov 2010 Y NISHIYAMA ...
Page 58: ...D 4 Y Hatai ...
Page 59: ...23 Apr 2013 Y NISHIYAMA D 5 ...
Page 60: ...23 Apr 2013 Y NISHIYAMA D 6 ...
Page 61: ...D 7 13 Sep 2011 Y NISHIYAMA ...
Page 62: ...D 8 13 Sep 2011 Y NISHIYAMA ...
Page 63: ...13 Sep 2011 Y NISHIYAMA D 9 ...
Page 64: ...13 Sep 2011 Y NISHIYAMA D 10 ...
Page 65: ...13 Sep 2011 Y NISHIYAMA D 11 ...
Page 66: ...D 12 13 Sep 2011 Y NISHIYAMA ...