1. HOW TO INSTALL THE SYSTEM
1-5
How to install the stays (anti-vibration measure)
Install stays from the top of the hull unit to the ship's hull. The stays should be angle
iron with a size of 75
×
75
×
9 mm or more and at least two pieces should be used; one
each to ship's bow and stern directions.
This measure must be done to prevent
damage to the transducer
.
Do not install the stays on a crossbeam on the overhead. Vibration-resistance effect
is reduced since vibration is applied to the stays as rotation force. Install them horizon-
tally.
Hex. nut
Spring washer
Flat washer
Bow mark
HULL UNIT FLANGE
O-ring
TANK FLANGE
Flat washer
Hex bolt
Spring washer
Flat washer
Retraction
Tank
Bow
Bow side (17 places)
O-ring
Hex. nut
Spring washer
Flat washer
Flat washer
Hex. bolt
Stern side (7 places)
O-ring
Hex. nut
Bow
Stay
Stay
Hull Unit
Summary of Contents for FSV-35
Page 22: ...1 HOW TO INSTALL THE SYSTEM 1 16 This page is intentionally left blank ...
Page 55: ...D 1 13 Sep 2011 Y NISHIYAMA ...
Page 56: ...D 2 13 Sep 2011 Y NISHIYAMA ...
Page 57: ...D 3 5 Nov 2010 Y NISHIYAMA ...
Page 58: ...D 4 Y Hatai ...
Page 59: ...23 Apr 2013 Y NISHIYAMA D 5 ...
Page 60: ...23 Apr 2013 Y NISHIYAMA D 6 ...
Page 61: ...D 7 13 Sep 2011 Y NISHIYAMA ...
Page 62: ...D 8 13 Sep 2011 Y NISHIYAMA ...
Page 63: ...13 Sep 2011 Y NISHIYAMA D 9 ...
Page 64: ...13 Sep 2011 Y NISHIYAMA D 10 ...
Page 65: ...13 Sep 2011 Y NISHIYAMA D 11 ...
Page 66: ...D 12 13 Sep 2011 Y NISHIYAMA ...