6-2
Waterproofing
gasket
Sealant
Figure 6-2 Laying the waterproofing gasket on the tank flange
3. Orient the bow mark (arrow) on the hull unit flange toward ship’s bow. (If the mark cannot
be perfectly oriented toward ship’s bow adjust heading after installation as shown in the
next chapter.)
Hull unit flange
Ship's
bow
Figure 6-3 Orienting hull unit flange toward ship’s bow
4. For the 1200 mm stroke hull unit, insert insulation gaskets in each of the 11 holes for stud
bolts on the tank flange. (Do this before setting the hull unit to the retraction tank.)
Insulation
gasket
Figure 6-4 Inserting insulation gasket in tank flange
5. Before setting the hull unit on top of the retraction tank, observe the following cautions:
• Clean the hull unit flange to make sure no foreign material has fallen into the retraction
tank.
• Confirm that waterproofing gasket is in place.
Summary of Contents for CSH-83
Page 1: ...COLOR SCANNING SONAR MODEL CSH 83 84 Back ...
Page 6: ...This page is intentionally left blank ...
Page 11: ...3 2 Heater Heat insulator Figure 3 2 Typical sonar compartment ...
Page 68: ...A 10 ...
Page 77: ...A 19 ...
Page 78: ...A 20 ...
Page 79: ...A 21 ...
Page 80: ...A 22 ...
Page 81: ...A 23 ...
Page 82: ...A 24 ...
Page 83: ...A 25 ...
Page 84: ...A 26 ...
Page 85: ...D 1 ...
Page 86: ...D 2 ...
Page 87: ...Y Hatai D 3 ...
Page 88: ...D 4 ...
Page 89: ...Oct 31 03 D 5 ...
Page 90: ...Dec 10 02 D 6 ...
Page 91: ...D 7 ...
Page 92: ...D 8 ...
Page 93: ...D 9 ...
Page 94: ...D 10 ...
Page 95: ...D 11 ...
Page 96: ...D 12 ...
Page 97: ...D 13 ...
Page 98: ...D 14 ...
Page 99: ...D 15 ...
Page 100: ...D 16 ...
Page 101: ...D 17 ...
Page 102: ...D 18 ...
Page 103: ...D 19 ...
Page 104: ...D 20 ...