2-5
2.5 Synchronizing Transmission with Other Equipment
When two CSH-7s are installed connect them as shown below. This will synchronize the trans-
mission of the #2 sonar with that of the #1 sonar.
Synchronizing with another CSH-7
1) Wiring
#2 Sonar
#2 Sonar
TRANSCEIVER UNIT
TRANSCEIVER UNIT
DIG Board
DIG Board
J7
J7
5
6
1
2
INT-KPC-H
INT-KPC-C
EXT-KPC-H
EXT-KPC-C
Figure 2-7 Connection of two sonars
2) DIP switch setting
Set DIP switches on the DIG board as follows:
h
c
t
i
w
s
P
I
D
r
a
n
o
S
1
#
r
a
n
o
S
2
#
3
#
-
1
S
—
N
O
4
#
-
1
S
N
O
—
3) Menu setting
On Menu-2, set external KP ON for the #2 sonar. Refer to the operator’s manual for menu
setting procedure.
Summary of Contents for CSH-7
Page 1: ...COLOR SCANNING SONAR MODEL CSH 7 ...
Page 4: ...ii ...
Page 6: ...iv SYSTEM CONFIGURATION ...
Page 15: ...1 8 ...
Page 16: ...1 9 ...
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......