ATR833 / P/N 833-(1xx)-(1xx)
Operation and Installation
3.4 Unpacking and Inspecting the Equipment
Carefully unpack the equipment. Damages due to transportation must be
reported to the shipping company immediately. Save the shipping
container and all packing materials to substantiate your claim
For storage or reshipment the original packaging should be
used.
3.5 Mounting
•
In cooperation with a maintenance shop, location and kind of the
installation are specified. The maintenance shop can supply all
cables. Suitable sets of cables are available from Funkwerk
Avionics GmbH.
•
Select a position away from heat sources. Care for adequate
convection cooling.
•
Leave sufficient space for the installation of cables and connectors.
•
Avoid sharp bends and wiring close to control cables.
•
Leave sufficient lead length for inspection or repair of the wiring of
the connector.
•
Bend the harness at the rear connectors to inhibit water droplets
(formed due to condensation) from collecting in the connector.
•
Remove rotary knobs before mounting:
o
Lift-off faceplate with an appropriate tool
o
Loosen screw and remove rotary knob
o
Insert cap correctly orientated!
•
The equipment is fixed front-laterally with four 6-mm through-hole
screws in a 57 mm cut-out.
•
For mounting details/drawing refer to chapter 3.13.2 Mounting
Advices.
29
Dokument-Nr.: 01.1402.010.71e / Revision: 1.01