3. DAILY OPERATING TESTS 

CAUTION 

If any of the following tests fail to function as described, shut down the boiler immediately and 

consult the factory. 

 

With the burner firing, carry out the following tests: 

 

NOTE 

Ensure  the  correct  water  level  is  maintained  during  pressure  build  up.  If  any  part  of  the 

equipment is not operating correctly, the fault should be investigated before the boiler is used. 

Ensure all blowdown pipework is safe and discharged to a blowdown receptacle. 

 

Flame Sensor (UV Photo Cell) Check. 

Remove the burner UV photocell from its plug-in connection (on the side of the burner) and cover the 

detection  window  to  exclude  all  light.  The  burner  control  should  immediately  (2-3  seconds  gas,  5 

seconds oil) go to a lockout/flame failure condition and will require manual resetting. Clean the UV 

photocell with soft cloth before replacing it. 

 

Pump Check. 

(a)  Lower the water level in the boiler, either by evaporation or by opening the main blowdown valve 

with the key provided. 

(b)  Observe the water level in the water level gauges and, as the water level falls, check that the 

feedwater pump starts. 

(c)  SHUT the main blowdown valve if opened, and ensure that the feedwater pump continues to fill 

the boiler to the correct level then switch off. 

 

 

1

st

 Low Water Check. 

(a)  Turn the Pump On/Off Switch on the boiler control panel to the PUMP OFF position. 

(b)  Lower the water level in the boiler, either by evaporation or by opening the main blowdown valve 

with the key provided. 

(c)  Observe the water level in the water level gauges and check that, as the water level reached the 

low water position: 

The 1

st

 Low Water alarm sounds. 

The 1

st

 Low Water indicator lamp illuminates. 

The burner stops firing. 

(d)  SHUT the main blowdown valve if opened, and turn the Pump On/ Off Switch to the PUMP ON 

position, Check that: 

The feedwater pump starts. 

The water level in the boiler is restored to the normal working position. 

The 1

st

 Low Water indicator lamp extinguishes and the alarm cancels. 

The burner automatic start sequence commences. 

 

2

nd

 Low Water Check. 

(a)  Repeat  the procedure  described in  above  section but  allow  the  water  level to  continue  to  fall, 

either by evaporation or maintaining the main blowdown valve open. Before the level falls below 

the level of the water level gauge, check that the 2

nd

 Low Water Alarm/Reset Switch illuminates, 

the alarm sounds and the burner shuts down. 

(b)  SHUT the main blowdwon valve (if opened). 

(c)  Set the Pump On/ Off Switch to the PUMP ON position. 

(d)  Check that: 

The feedwater pump starts, restores the water level to a safe working level, then stops. 

The 1

st

 Low Water alarm cancels. 

The 1

st

 Low Water indicator lamp extinguishes but the burner does not start. 

The 2

nd

 Low Water alarm continues to sound. 

The 2

nd

 Low Water Alarm/Reset Switch remains illuminated. 

(e)  Press the 2

nd

 Low Water Level Alarm/Reset switch. 

(f)  Check that: 

The 2

nd

 Low Water alarm cancels. 

The 2

nd

 Low Water Alarm/Reset Switch extinguishes. 

The automatic burner firing sequence commences. 

Summary of Contents for FB-S series

Page 1: ...FULTON BOILER FB S SERIES INSTALLATION OPERATION MAINTENANCE MANUAL...

Page 2: ...pment the following tests are made to assure the customer the highest standards of manufacturing a Material inspections b Manufacturing process inspections c ASME welding inspection d ASME hydrostatic...

Page 3: ...ney requirements Water supply Valves Electrical Requirements Gas Supply Oil Supply Installation check points Cleaning Boil out of new unit 4 Controls Burner Boiler Control panel Burner 5 Operation Fit...

Page 4: ...be highlighted It is the responsibility and duty of all personnel involved in the operation and maintenance of this equipment to fully understand the WARNINGS CUATIONS and NOTES by which hazards are...

Page 5: ...erating and maintenance instructions are followed FB S boiler is a cylindrical vessel with horizontal tubes passing through and connected to the front and rear tube sheets The vessel contains the wate...

Page 6: ...1 1200 Kcal kg heavy oil 10 960 kcal kg nature gas 8 900 kcal m 3 town gas 3600kcal m 3 2 Specification and dimensions are approximate the Fulton Companied reserve the right to change specifications...

Page 7: ...g Dimensions of the boiler and the necessary clearance Model FB S 1 1 0 1 5 1 0 2 1 0 3 1 0 4 1 0 4 1 25 6 1 25 Total length mm 3324 3624 4072 4772 4956 4956 5540 Total width mm 1705 1785 2100 2196 21...

Page 8: ...by accumulating condensation in flue F The installer should check the draft with a meter at 02 04 W C pressure 0 508 to 1 016mm with the burner off If the pressure is too low a balancing damper should...

Page 9: ...ormation on how to prevent the presence of unwanted solids and corrosive gases Accomplishment of the above objectives generally requires proper feed water treatment before and after introduction of th...

Page 10: ...the burner gas train and furnace while running at full input This pressure is different from the kinds of the burner used for the boiler On FB S1 1 0 to FB S3 1 0 the pressure of supply gas is 50 100...

Page 11: ...inlet should be made using the flexible pipes supplied with the burner C One gate valve should installed to the inlet and outlet of the circulating pump separately A pressure gauge 0 60psi is needed a...

Page 12: ...nd cleaning of the waterside of the pressure vessel should be provided during the course of initial start up The pressure vessel and the steam and return lines or hot water piping represent in effect...

Page 13: ...irring it at all times until the chemical is completely dissolved Add the chemical slowly and in small amounts to prevent excessive heat and turbulence 3 An over flow pipe should be attached to one of...

Page 14: ...e pressure vessel should be drained after being properly cooled to near ambient temperature Hand hole covers should be removed and waterside surfaces should be inspected for corrosion pitting or forma...

Page 15: ...cator when fitted This lamp will illuminate and alarm sound when the water level reaches a pre determined high level The feed pump will stop When the water level falls to the normal working level the...

Page 16: ...with a sensing device to supervise the ignition sequence prove the flame is satisfactory and finally monitor the established flame Should any fault occur either during the ignition sequence or during...

Page 17: ...to preheat the oil to correct temperature The unit is equipped with three thermostats low temperature operating and limit A thermometer and hot oil filter are mounted together as one unit on the top l...

Page 18: ...2 and V3 remain closed for 23 seconds while the minimum side of the gas pressure switch PS checks for an increase in pressure If no crease occurs there is no leakage past V1 and the sequence continues...

Page 19: ...EQUENCE The burner operating sequence begins with a pre purge period on full air Fuel is then supplied to the burner at start rate and ignition initiated Start flame proving is followed by establishme...

Page 20: ...nly Off Burner Pump Switch to the PUMP ONLY position H The feed pump should start and fill the boiler to the pump off level and then switch off NOTE If the 2nd Low Water and High Pressure Alarm Reset...

Page 21: ...intain the internal temperature to a point that the boiler can be simple switched on preferably on low fire and then left to reach working temperature pressure The life expectancy of the boiler and do...

Page 22: ...ter level in the boiler either by evaporation or by opening the main blowdown valve with the key provided c Observe the water level in the water level gauges and check that as the water level reached...

Page 23: ...ed solids level to within the required limits The amount of blowdown and hence time required it dependent on the amount of TDS in the raw water supply the percentage condensate return water treatment...

Page 24: ...d Low Water Alarm Reset switch will extinguish the alarm will cancel and the burner will start NOTE Because the burner shuts down during this test it is possible that the steam load will rapidly decre...

Page 25: ...be within setting of low pressure and light pressure switch d Check burner air proving switch and high fire limit switch e Heavy oil fired unit oil temperature below minimum setting 4 Fuel valve inte...

Page 26: ...nadequate flame signal or open control in the running interlock circuit 7 Interlock device inoperative or defective 8 Air in the oil lines Bleed lines Boiler will not maintain pressure 1 Check oil sup...

Page 27: ...as soon as a leak occurs can prevent costly repairs later Check for signs of leaks on all valves and fittings and take the appropriate action Test all the boiler water level functions by evaporation...

Page 28: ...y cutting out the defective area and replacing with new fibre ensure the correct adhesive is used r Examine the end of the burner blast tube where it extends through the door into the furnace Clean of...

Page 29: ...itting Instructions Blowdown the boiler completely and examine all inspection holes in the boiler If any leakage is evident proceed as follow a Disassembly the crabs and cover plate and remove the ins...

Page 30: ...e boiler instruction manual shipped with your boiler Corrosive acid and chlorine based chemicals in the atmosphere can be damaging to this boiler It is the owner s responsibility to have the boiler ro...

Reviews: