Fulton Boiler FBS Series
FBS 01/05 18
BURNER OPERATING SEQUENCE
The burner operating sequence begins with a pre-purge period on full air. Fuel is then supplied to the
burner at start rate and ignition initiated. Start flame proving is followed by establishment of the main
flame. Consult the following timing chart.