Technical Support is available 8am-5pm PST. Monday - Friday
•
702-802-3103
89
Technical Support is available from 8am to 5pm (PST) M - F at [email protected].
92
Belt Installation
The belts on your laser system are a consumable item and will eventually stretch beyond a
usable
length or break. You can contact Full Spectrum Laser support for replacements.
SHOCK WARNING!
The capacitors in the power supply
retain power even after turning the laser off. To ensure your
safety, turn off the laser, remove the power cord and wait at
least 1 hour before accessing the power supply.
WATER WARNING!
You will be disconnecting the water
system and working with the laser upside down. Be sure the
machine is dry before proceeding with this process.
REQUIRED PARTS AND TOOLS:
2.5mm Hex key (included with accessories)
1. BELT INSTALLATION STEPS:
Power Off Machine. Power off and unplug your unit. Wait at least 1 hour for capacitors to discharge.
2. Disconnect Water:
Detach the tubes from the rear connectors. Use the small piece of tubing
that shipped with your laser to shunt the two water bulkheads together.
3. Loosen Retaining Screws:
Loosen or remove the M3 retaining screws and washers so that
the old belt can be removed and discarded.
4. Mount Belt:
Run each end of the new belt through the mounting slot with the teeth on the inside
of the closed loop. The ends of the belt should protrude by approximately 3 teeth (6mm) through the
slot. Make sure that the belt forms a flat, closed loop.
5. Tighten Retaining Screws:
Tighten the M3 retaining screws to secure and retain the belt.
Starting the thread with your fingers can speed the process up.
6. Loosen the idler pulley mount:
Once the belt has been installed on the riser, loop over the
drive and idler pulleys.
7. Tension the belt:
Pull on the Y idler pulley mount with your hand. Moderate to strong force is
recommended. If the motors do not jog, verify that the motors are connected to the control card.
Section VIII.
Hardware & Maintenance
Belt Installation
The belts on your laser system are a consumable item and will eventually stretch beyond a usable length or
break. You can contact Full Spectrum Laser support for replacements.
• The capacitors in the power supply retain power even after turning the laser off.
To ensure your safety, turn off the laser, remove the power cord and wait at least
1 hour before accessing the power supply.
• You will be disconnecting the water system and working with the laser upside
down. Be sure the machine is dry before proceeding with this process.
WARNING
Required Parts and Tools
• 2.5mm Hex key (included with accessories)
Belt Installation Instructions
1. Power Off Machine.
Power off and unplug your unit. Wait at least 1 hour for capacitors to discharge.
2. Disconnect Water:
Detach the tubes from the rear connectors. Use the small piece of tubing that
shipped with your laser to shunt the two water bulkheads together.
3. Loosen Retaining Screws:
Loosen or remove the M3 retaining screws and washers so that the old
belt can be removed and discarded.
4. Mount Belt:
Run each end of the new belt through the mounting slot with the teeth on the inside of the
closed loop. The ends of the belt should protrude by approximately 3 teeth (6mm) through the slot. Make
sure that the belt forms a flat, closed loop.
5. Tighten Retaining Screws:
Tighten the M3 retaining screws to secure and retain the belt.Starting the
thread with your fingers can speed the process up.
6. Loosen the idler pulley mount:
Once the belt has been installed on the riser, loop over the drive and
idler pulleys.
7. Tension the belt:
Pull on the Y idler pulley mount with your hand. Moderate to strong force is
recommended. If the motors do not jog, verify that the motors are connected to the control card.
Summary of Contents for MUSE 3D
Page 1: ......