- 97 -
Maintenance
►
Emptying the hydraulic unit
- Remove the facade from the hydraulic unit.
- Place the distribution valve in the middle position.
- Open the emptying valve (ref.
5
).
- Open the hydraulic unit’s manual bleed-tap (ref.
6
).
- Open the installation bleed tap.
►
Distribution valve
Ensure the distribution valve is fi tted in the correct
direction:
Channel
AB
: Outlet to the hydraulic unit.
Channel
A
open: Return from DHW tank.
Channel
B
open: Return from the heating circuit.
►
ACI check
- Check polarity.
- Check voltage: With the appliance powered on,
the voltage value must be positive and lie between
+10 and +13 V DC.
fi
g. 6 - Mounting the distribution valve
fi
g. 9 - ACI check
Flow towards
exchanger
Return from
the heating circuit
B
A
AB
Return
from DHW tank
Valve
Valve motor
U = +10
+ 13V
Contrôle de l'alimentation ACI
Raccordement
Raccordement ACI :
Le
sur la masse du ballon,
Le
sur le connecteur de l'électrode.
-
+
à
ACI power supply control
Connection
ACI connection:
- to the tank body,
+ to the electrode connector.
to
Waterstage / Maintenance Manual / 2105 - EN