- 57 -
Line
Function
Setting range
or display
Setting
increment
Basic
setting
Domestic hot water
If the installation is fitted with the DHW kit.
1600
U
Operating mode
Off, On, Eco
On
1610
U
Nominal setpoint
Reduced setpoint (line 1612)…
65 °C
1
55 °C
The backup electrical system is required to reach this level.
1612
U
Reduced setting
8 °C...
Nominal setting (line 1610)
1
40 °C
1620
I
Release of DHW load
24h / day
Heating circuit time programme
Programme 4 / DHW
Off-peak tariff (Off-peak)
Programme 4 / DHW
and Off-peak
Programme
4 / DHW
24h / day
: The temperature of the DHW is constantly maintained at the DHW comfort setting.
Heating circuit time programme:
The DHW is produced according to the programming for the ambient temperature
(with 1 hour in advance when switched on).
Programme 4 / DHW:
The DHW programme is separate form the heating circuit programme.
Off-peak tariff* :
The electrical backup heating is only authorised to operate during the off-peak period.
T'prog 4/DHW or low-tariff *:
The electrical backup heating is authorised to operate during the comfort period or off peak.
* - Connect the "Power Provider" contact to input EX2 (see
fig. 36, page 43
). In the case of a day /night contract,
the electric back-ups for the DHW tank are subject to the power supplier's tariffs. Switching on the electric back-up for
the DHW tank is only authorised during off-peak hours.
1640
I
Legionella function
Off, Periodically (depending line setting 1641),
Fixed weekday (depending line setting 1642)
Off
1641
I
Legionella function periodically
1 to 7
1 day
7
1642
S
Legionella function weekday
Monday, Tuesday,...
Saturday
1644
S
Legionella funct time
1645
S
Legionella funct setpoint
1646
S
Legionella funct duration
1647
S
Legionella funct circ pump
Off, On
Off
1660
S
Circulating pump release
Time program 3/HCP, DHW release,
Time program 4/DHW, Time program 5
DHW release
Swimming pool (Only with swimming pool kit option)
2055
U
Setpoint solar heating
8... 80 °C
26 °C
2056
U
Setpoint source heating
8... 35 °C
22 °C
2057
S
Swi diff source heating
0.5... 3 °C
0.5 °C
2065
S
Charging priority solar
Priority 1, Priority 2, Priority 3
Priority 1
2080
S
With solar integration
No, Yes
Yes
Waterstage / Installation / 2011 - EN
Summary of Contents for Waterstage WOYK150LJL
Page 17: ... ...
Page 37: ... ...
Page 39: ... 39 fig 33 Cable passages Power cables Sensor cables Waterstage Installation 2011 EN ...
Page 67: ... ...