U41182-J-Z126-1-74
17
Controls and indicators
Control panel on the S120 Business Server cabinet
CANCEL / ALARM STOP
When this button is pressed, start of the IMPL for the security query is aborted or, in the
event of an error, the buzzer in the control panel is stopped and the CHECK light is extin-
guished. If another malfunction occurs after the light is extinguished, e.g. a machine
error or a malfunction in the power supply, the buzzer and the CHECK light are reacti-
vated.
IMPL
When this button is pressed twice, the IMPL is executed and confirmed. The S120 is
initialized and the firmware is loaded in the individual components (CPU, channel
processor). Furthermore, the IORSF selected in the IORSF Control Frame is activated.
After the IMPL is terminated, the P codes in the LCD display are extinguished. After-
wards an IPL (Initial Program Load) of the BS2000 can be executed on the SKP.
This button loads another configuration or activates another IORSF.
A protective cover prevents the button being pressed inadvertently.
The system will crash if an IMPL is executed during operation.
If this instruction is not heeded, BS2000 will be terminated abruptly!
After you press the IMPL button for the first time the question
ARE YOU SURE?
is
displayed on the LCD display.
–
If no IMPL is to be executed, the CANCEL / ALARM STOP button can be
pressed or the IMPL request terminates itself after 10 seconds.
–
If the IMPL is to be started, the IMPL button must be pressed a second time.
!
Summary of Contents for S120 Series
Page 6: ...Eine Dokuschablone von Frank Flachenecker by f f 1992 ...
Page 30: ...Eine Dokuschablone von Frank Flachenecker by f f 1992 ...
Page 90: ...Eine Dokuschablone von Frank Flachenecker by f f 1992 ...
Page 102: ......
Page 106: ......