5 Troubleshooting
81
E
Even when the power switch is set to "R", the power cannot be
turned on.
(Power LED is not lit green)
Proper power AC line voltage is
supplied to the outlet?
Off
No
No
Supply it.
No
No
No
No
No
No
Connect it properly.
"4.2 Connecting the Power
Cable" (p.76 )
Deal with this trouble referring to
"Even when the power switch is
set to "|", the power cannot be
turned on." (p.79)
What is the status of the Power LED?
When setting the power switch to
"|", POWER LED lights green?
The SCSI cable (for server
connection) is come down?
No
No
No
No
The SCSI cable (for server
connection) is connected correctly?
No
No
Connect it properly.
4.1 "Connecting the SCSI Cable
for the Server" (p.75)
(1) The server SCSI card is
recognized correctly?
(2) The Term Power setting is
correct?
(1) Refer to "Troubleshooting" in
the server or SCSI card's manual.
(2) Refer to each backup unit's manual,
and check that the Term Power setting
is correct.
Lit up amber
or
Blinking green
The power cable is connected
properly?
The power cable is damaged?
Contact maintenance support.
Contact maintenance support.
Go to next page.
Summary of Contents for PRIMERGY SX10 S2
Page 1: ...J E B7FY 2431 01 SX10 S2 バックアップキャビネット取扱説明書 SX10 S2 User s Guide PG R2BC1 ...
Page 14: ...14 トップカバーの取り付け トップカバーの取り付けは はめ込み位置を合わせてから取り付けてください 取り付け後 トップカバーはロックされます 䊃䉾䊒䉦䊋䊷 䌛 㕙 䌝 䉕ว䉒䈞䉎 ...
Page 22: ...22 12 ケーブルクランプを使用してケーブル類を束ねます 䉬䊷䊑䊦䉪䊤䊮䊒 ...
Page 31: ...3 ラックへの搭載 31 J 8 本製品とラックを固定します 本製品や周辺装置が搭載されていない場所には ラックに添付のブランク パネルを取り付けてください 䛴䜎䜏䝛䝆 ...
Page 44: ...44 ...
Page 65: ...2 Installing Internal Options 65 E 12 Bind the cables using the cable clamp Cable clamps ...
Page 92: ...92 ...
Page 94: ......