28
U41147-J-Z156-2-76
Installing the rack model
Installation
Figure 5: Mounting the server in the rack
Ê
Place the server onto the two projecting telescope bars. Make sure that the
two metal noses (1) protrude over and grip the bars.
Ê
Adjust the server so that the bore holes of the telescope bars and of the
server line up. Keep the telescope bars engaged.
Ê
Screw the telescope bars to the server on the left and right (six screws
altogether).
The following steps require only one person.
Figure 6: Telescope bar with safety spring
Ê
Press in the safety springs (1) on both telescope bars.
1
1
Summary of Contents for PRIMERGY H200
Page 4: ......
Page 5: ...Related publications and index ...
Page 6: ......
Page 10: ......
Page 18: ...8 U41147 J Z156 2 76 Technical data Introduction ...
Page 19: ...U41147 J Z156 2 76 9 Introduction Technical data ...
Page 20: ......
Page 21: ...U41147 J Z156 2 76 11 Introduction Technical data ...
Page 22: ...12 U41147 J Z156 2 76 Technical data Introduction ...
Page 32: ......
Page 71: ...U41147 J Z156 2 76 61 Troubleshooting and tips Error messages on the control panel ...
Page 72: ......
Page 100: ......
Page 140: ......
Page 142: ......
Page 150: ......
Page 152: ......
Page 154: ......