CX270 S2
Upgrade and Maintenance Manual
93
Expansion cards, interposer boards and battery backup units
6.2.2
Handling SFP+ transceiver modules
6.2.2.1
Installing SFP+ transceiver modules
Required tools
●
Installing SFP+ transceiver modules: tool-less
Preparing the SFP+ transceiver module
Figure 39: Removing the protective optical port plug
Upgrade and Repair Units (URU)
Average task duration: 5 minutes