Main memory
8.4.5
Concluding steps
Perform the following procedures to complete the task:
Ê
If applicable, install the air cowls as described in section
"Installing the air
cowls" on page 170
.
Ê
If applicable, reinstall the mezzanine carrier as described in section
"Installing mezzanine cards" on page 134
.
Ê
Close the server blade as described in section
"Closing the server blade" on
page 56
.
Ê
Reinstall and secure the server blade in the system unit as described in
section
"Installing the server blade in the system unit" on page 57
.
Ê
If applicable, close the rack door as described in section
"Closing the rack
door" on page 62
.
Ê
If available, update the system board BIOS to the latest version as described
in section
"Updating or recovering the system board BIOS and iRMC" on
page 73
.
Ê
Enable boot watchdog functionality as described in section
"Enabling boot
watchdog functionality" on page 84
.
Ê
Enable the replaced memory module(s) as described in section
"Enabling
replaced components in the system BIOS" on page 85
.
Ê
Verify if the memory mode has been restored to its original state as
described in section
"Verifying the memory mode" on page 85
.
Ê
If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
"Enabling