CHAPTER 2
Core Configuration
Installing Optical/Tributary Shelf, LAS, and Heat Baffle
FNC-7500-0061-200
Issue 1, May 2009
FLASHWAVE 7500 Release 6.1
Equipment Installation
2-28
Fujitsu and Fujitsu Customer Use Only
A heat baffle is required for each Optical/Tributary shelf and must be installed directly above
the shelf.
Note:
The FLASHWAVE 7500 shelves do not have front covers because of front-access fiber
cabling.
Note:
are shown fully populated for instructional
purposes. At installation, the shelves do not have plug-in units installed. The shelves are not
populated until system turn-up.
Note:
The LAS1 should be mounted in the rack that best facilitates the fiber management of the
MPO-to-MPO cabling from the Optical shelf at the time of installation. The LAS1 contains only
passive components and does not require any power connections.
DAN
G
ER:
Do not attempt to handle and install the shelves without sufficient assistance. The
Optical/Tributary shelf weighs approximately 95 lb (43.0 kg) empty (without fans).
Equipped, the Optical/Tributary shelf weighs significantly more. Handling the equipment
without sufficient assistance may result in personal injury, damage to the equipment, or
both.
WARNIN
G
:
Do not use the internal walls of any shelf as a lifting point or lift support. Doing so may
damage the plug-in unit rail support.
CAUTION:
Do not compromise the stability of the rack when installing this equipment. Unstable racks
can fall resulting in equipment damage.
Step
Task
1
If not already done, remove the shelf and heat baffle from the shipping container.
2
Ensure that all plug-in units are removed from the shelf.
Note:
Do not remove filler panels.
3
Secure the shelf to the rack using five screw slots on each side of the shelf as shown in
.
Revision 1, June 2009
Summary of Contents for FLASHWAVE 7500
Page 8: ...Revision 1 June 2009 ...
Page 10: ...Revision 1 June 2009 ...
Page 16: ...Revision 1 June 2009 ...
Page 362: ...Revision 1 June 2009 ...
Page 386: ...Revision 1 June 2009 ...