Installing Power, Ground, and Alarm Cables
5-39
FLASHWAVE 7500 Release 6.1
Equipment Installation
Fujitsu and Fujitsu Customer Use Only
FNC-7500-0061-200
Issue 1, May 2009
21
Connect both ends of cable MA of the power harness as follows:
a.
Identify lug MA in the power harness (see
) and connect it to shelf
terminal MAIN A (see
).
b.
Connect the other end of the same cable to CBP terminal BATT A1 CB2 (see
).
22
Connect both ends of cable MB of the power harness as follows:
a.
Identify lug MB in the power harness (see
) and connect it to shelf
terminal MAIN B (see
b.
Connect the other end of the same cable to CBP terminal BATT B1 CB2 (
).
23
Connect both ends of cable FGND of the power harness as follows:
a.
Identify lug FGND in the power harness (see
) and connect it to
shelf terminal FG (see
).
b.
Connect the other end of the same cable to the equipment rack frame ground.
24
Replace the plastic cover over the shelf backplane terminal strip.
Install Shelf Power Harnesses CB3
25
Refer to the cabling schematic (identified in
) and
. Is a
shelf to be connected to circuit breaker 3 (CB3)?
If YES:
If NO:
26
Locate the rack/shelf power harness (HA15B-0001-C413,
) for the shelf.
Note:
The length of the cables may be altered at the discretion of the installer to ensure proper
length.
Revision 1, June 2009
Summary of Contents for FLASHWAVE 7500
Page 8: ...Revision 1 June 2009 ...
Page 10: ...Revision 1 June 2009 ...
Page 16: ...Revision 1 June 2009 ...
Page 362: ...Revision 1 June 2009 ...
Page 386: ...Revision 1 June 2009 ...