Commissioning Test
BroadOne GX40000 Manual (R3.0) issue 1.03
3-1
3
Commissioning Test
3.1
Overview
This chapter explains the antenna orientation and how to do the commission
test for the GX4000 link. Main topics covered are;
Preparation
Antenna alignment guideline
Antenna alignment procedure
Continuity tests after antenna alignment
Configuration setting (Provisioning)
3.2
Preparation
The following safety precautions must be observed when installing, using, or
maintaining radio equipment. These precautions ensure the safety of all
personnel and the protection of radio equipment.
Station and Hop Test Items
Table 3.2.1 Antenna Alignment & Commissioning Test Items
Task Name
Manual Reference
Notes
Preparation
DC Power Supply ON
Section 3.3
Open WebLT
Section 3.4
Antenna Alignment
TX power setting
Section 3.5
Antenna alignment
Section 3.5
Continuity Test
Signal continuity Tests
Section 3.6
Performance monitoring
Section 3.6
Note:
In case that test result is out of specification, please refer to Chapter 4
Maintenance and trouble shooting.
Measuring Instrument Required
The typical measuring instrument required to carry out the commissioning
tests are as follows
;--
Multi-meter for power supply voltage and antenna alignment test
PC for configuration setting & performance monitoring