3. Defrost Flow Chart
3-1. For AU*24LUAR
The defrosting shall proceed by the integrating operation time as follows.
(Not defrosted for 6 or 10 minutes)
3 sec later Compressor OFF
3 sec later Outdoor fan motor OFF
28 sec later 4-way valve OFF
34 sec later compressor ON
(Frequency : 95 Hz)
Heating operation start : Compressor ON
Defrost Indicator:
[Operation lamp]
9 sec ON / 1 sec OFF
Outdoor heat exchanger temperature: Over 10°C
or
Compressor ON time: Over 15 minutes
Defrost end
05-16
Compressor integrating operation: 40 minutes and over
Outdoor heat exchanger temperarure: Below -8°C
Defrost start
Summary of Contents for AO*24LMAKL
Page 5: ...1 SPECIFICATIONS R410A CASSETTE type INVERTER ...
Page 11: ...2 DIMENSIONS R410A CASSETTE type INVERTER ...
Page 15: ...3 REFRIGERANT SYSTEM DIAGRAM R410A CASSETTE type INVERTER ...
Page 19: ...4 CIRCUIT DIAGRAM R410A CASSETTE type INVERTER ...
Page 25: ...5 DESCRIPTION OF EACH CONTROL OPERATION R410A CASSETTE type INVERTER ...
Page 47: ...6 REFRIGERANT CAUTION R410A R410A CASSETTE type INVERTER ...
Page 56: ...7 TROUBLE SHOOTING R410A CASSETTE type INVERTER ...
Page 91: ...8 APPENDING DATA R410A CASSETTE type INVERTER ...
Page 110: ...9 INSTALLATION MANUAL R410A CASSETTE type INVERTER ...
Page 117: ...10 REPLACEMENT PARTS R410A CASSETTE type INVERTER ...
Page 158: ...10 41 8 DRAIN PAN removal Remove the DRAIN PAN ASSY DRAIN PAN ASSY ...
Page 162: ...1116 Suenaga Takatsu ku Kawasaki 213 8502 Japan Apr 2006 Printed in Japan ...