5.
Monitor
Application
Copyright© 2009-2017 Fujitsu General Limited. All rights reserved.
91
Enlarge
Start-up Form bottun
Displays the following screen to create the Commissioning Report.
Default WorkSheets Setting button
Changes this excel sheet back to the default. This button is enabled after Commission-
ing Report was created at .
Project Name field
Enter the Project Name of Commissioning Report.
Open button
Select the CSV file to create Commissioning Report. (Multiple files can be selected.
Select the CSV file saved in the Detail Check List.)
Create button
Creates the Commissioning Report of CSV file selected at
.
Summary of Contents for AIRSTAGE UTY-ASGXZ1
Page 2: ......