32
A26361-K879-Z102-3-7619
Installing/Removing the Rack Model
Hardware Installation
4.4.1
Mounting into the PRIMECENTER Rack
For mounting the server in the PRIMECENTER Rack the following parts are
necessary:
–
support bracket
–
two telescopic rails (assembled)
–
four assembly brackets (VL; VR; HL; HR are panched onto the brackets)
–
eight plugwashers (figure 8 on page 33)
I
General information are provided in the Technical Manual for the PRIME-
CENTER Rack (see also “Related Publications” on page 87).
Figure 7: Prepare the telescopic rails
Ê
Fasten the delivered assembly bracket VL on the front end of the left
telescopic rail (1) with two screws M5x8 (2) as shown in figure 7.
Ê
Fasten the delivered assembly bracket HL on the rear end of the left
telescopic rail (3) with two screws M5x8 (4) and two hexagonal flange nuts
M5 as shown in figure 7.