Operations
2-5
1
2
3
A
B
C
Y
Z
010-021-20 09.2001
2.1.2 When the Power ON/OFF Sequences are Not Interlocked
Starting Up the System
1
Start up the CR Console.
(For detailed operation procedures, see the
[CR Console Operation Manual]
.)
The CR Console application software will start up.
[Fig. 2.5] CR Console Startup
Power ON/OFF
switch
Summary of Contents for FCR XG-1
Page 6: ...vi 010 021 20 09 2001...
Page 7: ...1 1 010 021 20 09 2001 1 Chapter 1 Introduction...
Page 17: ...2 1 010 021 20 09 2001 2 Chapter 2 Operations...
Page 37: ...3 1 010 021 20 09 2001 3 Chapter 3 When an Error Occurs...
Page 39: ...A 1 010 021 20 09 2001 A Appendix A Specifications...
Page 46: ...Specifications A 8 010 021 20 09 2001...
Page 47: ...B 1 010 021 20 09 2001 B Appendix B IP Handling...
Page 50: ...IP Handling B 4 010 021 20 09 2001...
Page 51: ...C 1 010 021 20 09 2001 C Appendix C Film Annotation...
Page 54: ...Film Annotation C 4 010 021 20 09 2001...
Page 91: ...Z 1 010 021 20 09 2001 Z Appendix Z Precautions for Exposure...
Page 100: ...FUJIFILM MEDICAL SYSTEMS U S A INC 419 WEST AVENUE STAMFORD CT 06902 U S A...