16
4.2 Preparation for operation
(1) Check of piping
Check that piping has been made correctly.
(2) Purging of analyzer interior
When purging is necessary, then flow purge gas for about 3 hours before turning on power.
Purge gas
INLET
INLET
OUTLET
OUTLET
PURGE
SAMPLE GAS
(3) Turning on power
Turn on the power switch and indication will appear in a few seconds.
INFRARED GAS ANALYZER
NO
vol%
ppm
vol%
ppm
HOLD
SPAN
SPAN
ZERO
ENT
COMP
FUNC
∧
>
MEAS
MEAS
RMT RANGE
SO
2
vol%
ppm
O
2
POWER
ON
OFF
(4) Turn on pump power supply
When the optional pump is provided, then pull out the base and turn on the pump power supply.
(5) Warmup
Flow the zero gas and warm up the instrument. The warmup is completed when the zero point
stabilizes (about 4 hours).