3 - 18
How to use the UG00P-DI transfer utility
1. Start “U2DI.exe”
Double-click the [U2DI.exe] icon, and the [UG00P-DI
transfer utility] dialog box will be displayed.
2. Select a port.
Select, in box
1
, a port to be used.
3. UG00P-DI information
Click the [UG00P-DI information] button to confirm the
program version and connectable model of UG00P-DI. (See the
figure at right.)
4. Select a program to be transferred.
The path to the UG00P-DI program file that is to be transferred is
displayed in text box
4
.
As default, “the folder in which UG00S-CW is installed as explained
above”/Tpa (folder)/dpprg.DI is displayed in this example.
To select other program file for transfer, click the [Reference] button. Then the [Select program file] dialog
box is displayed. In this dialog, set the program that you want to transfer.
5. Transfer the program file.
Turn on again the power switch of the PLC and click the [Transfer] button, and the program will begin to
be transferred. When no program is selected for transfer, the [Select program file] dialog box is displayed.
In this dialog, select a program that you want to transfer.
Comments related to communication condition are displayed in text box
2
: “Connecting to UG00P-DI” or
“Transferring data”, for example.
A bar is displayed in box
3
while the program is being transferred, and the message “Transfer com-
pleted” is displayed when transfer ended successfully. To cancel the program transfer in the middle, click
the [Cancel] button.
6 Connecting the Dual Port Interface
1
2
3
4
Precautions
•
Do not interrupt the communication by disconnecting and reconnecting the cable while the program is
being transferred. If interrupted, normal communication becomes impossible.
In such case, turn the power switch of the PLC on again and re-execute the instruction.
•
The UG00P-DI transfer utility is adapted to Ver. 2.4.0.0 or newer UG00S-CW.
*
If [UG00P-DI information] or [Transfer] instruction is executed after clicking
the [UG00P-DI information] or [Transfer] button and communicating with
UG00P-DI, the message “Receiving waiting time over” is displayed. Turn the
power switch of the PLC on again and re-execute the instruction.
Summary of Contents for UG220H Series
Page 270: ...Appendix Ladder Transfer Function...