![FRTek PrimAer 28 Operating Manual Download Page 6](http://html.mh-extra.com/html/frtek/primaer-28/primaer-28_operating-manual_2340219006.webp)
PRIVATE AND CONFIDENTIAL © 2020 FRTEK CO., LTD.
6
PrimAer 28GHz
Operating Manual
Figures
Figure 1. Network Configuration.
················································································· 16
Figure 3. DU Port Configuration.
·················································································· 19
Figure 5. SU Port Configuration.
··················································································· 21
····························································································· 22
Figure 7. Rectifier Port Configuration.
··········································································· 22
Figure 8. DU, SU Wiring Method - Fiber-Optic Cable
······················································ 23
Figure 9. DU, SU, Rectifier Wiring Method
··············································· 24
Figure 10. Required Space for DU Installation
································································ 35
Figure 11. DU Anchor Bolt Assemble for Wall Installation
··············································· 35
Figure 12. DU Wall Installation Assemble
······································································ 36
Figure 13. DU Pole Installation Assemble
······································································ 37
Figure 14. DU Ground Cable Connection
······································································· 38
Figure 16. DU Optic Cable and Power Cable Connection
················································· 40
Figure 17. Required Space for SU Installation
································································· 41
Figure 18. SU Anchor Bolt Assemble
············································································· 41
Figure 19. SU Wall Installation Assemble
······································································· 42
Figure 20. SU Pole Installation Assemble
······································································· 43
Figure 21. SU Ground Cable Connection
········································································ 44
Figure 23. SU_C Optic Cable and Power Cable Connection
··············································· 46
Figure 24. SU_E Optic Cable and Power Cable Connection
··············································· 47
Figure 25. Required Space for Rectifier Installation
························································· 47
Figure 26. Rectifier Anchor Bolt Assemble
····································································· 48
Figure 27. Rectifier Wall Installation Assemble
······························································· 49
Figure 28. Rectifier Pole Installation Assemble
······························································· 50
Figure 29. Rectifier Ground Cable Connection
································································ 51
Figure 30. Rectifier Power Cable Connection
·································································· 52
Figure 31. Standing Pole or Mounting Tripod Pole
························································· 53
·························································································· 56
··························································································· 59