Position of the primary meter in the consumption branch. *Termination resistance R 120 Ohm
Position of the primary meter at the feed-in point. *Termination resistance R 120 Ohm
The following must be observed in a multi meter system:
-
Connect the primary meter and the battery to different channels (recom-
mended).
-
Distribute the remaining Modbus participants evenly.
-
Each Modbus address is assigned only once.
-
Place the terminating resistors individually for each channel.
22