IMPORTANT!
Further information on successful start-up.
Observe the following information on connecting the data communication line to
the inverter.
-
Use a CAT5 type cable or higher.
-
For data lines belonging together (D+, D- and M1+, M1-) use a twisted pair of
cables.
-
If the output cables are close to the mains wiring, use wires or cables rated
at 300 V to 600 V (never less than the operating voltage).
-
Use double insulated or sheathed output cables when near bare conductors.
-
Use shielded twisted pair cables to avoid interference.
-
The outputs of the Fronius Smart Meter are galvanically isolated from dan-
gerous voltages.
Set the address
of the Fronius
Smart Meter
The Fronius Smart Meter must be connected to the Fronius Datamanager. If only
one Fronius Smart Meter is installed, the Modbus Address is 1.
DIP Switch
1
2
3
4
5
6
7
8
Up (1) value
1
2
4
8
16
32
R
120
Ohm
Baud
Rate
Examples
Modbus Adress 1
DIP
Switch
1
2
3
4
5
6
Position
1
0
0
0
0
0
Modbus Adress 2
DIP
Switch
1
2
3
4
5
6
Position
0
1
0
0
0
0
Modbus Adress 3 (value 1 + 2 = 3)
DIP
Switch
1
2
3
4
5
6
Position
1
1
0
0
0
0
Modbus Adress 4
DIP
Switch
1
2
3
4
5
6
Position
0
0
1
0
0
0
15
EN-US
Summary of Contents for WND-WR-MB
Page 2: ......
Page 17: ...17 EN US ...
Page 23: ...Commissioning 23 ...
Page 24: ...24 ...
Page 29: ...The Fronius Smart Meter is configured as a secondary meter 29 EN US ...
Page 35: ...35 EN US ...
Page 36: ... ...