
Remote communication of the connection
interruption
Output on the changeover contact
Housing material
Thermoplastic UL-94-V0
Test standards
IEC 61643-31 / DIN EN 50539-11
UL1449 ed.4 / VDE 0185-305-3 Bbl. 5
Explanation of
footnotes
1)
The values stated are defaults; the inverter is configured specifically to suit the
requirements of the relevant country.
2)
Depending on the country setup or device-specific settings
(ind. = inductive; cap. = capacitive).
3)
Maximum current from a defective PV module to all other PV modules. From the
inverter itself to the PV side of the inverter it is 0 A.
4)
Guaranteed by the electrical configuration of the inverter
5)
For backup power mode (PV Point) without battery, a minimum voltage of 150 V
is required.
6)
Current peak when switching on the inverter.
Integrated DC
disconnector
General data
Product name
Benedict LS32 E 7905
Rated insulation
voltage
1000 V
DC
Rated impulse with-
stand voltage
8 kV
Suitability for isolation
Yes, DC only
Utilization category
and/or PV utilization
category
according to IEC/EN 60947-3 Category of utilization DC-PV2
Rated short-time with-
stand current (I
cw
)
Rated short-time withstand current (I
cw
): 1000 A
Rated short-circuit
making capacity (I
cm
)
Rated short-circuit making capacity (I
cm
): 1000 A
Rated operational current and rated breaking capacity
Rated operational
voltage (U
e
)
Rated operational
current (I
e
)
I
(make)
/
I
(break)
rated operational
current (I
e
)
I
(make)
/
I
(break)
≤ 500 V
DC
14 A
56 A
36 A
144 A
600 V
DC
8 A
32 A
30 A
120 A
700 V
DC
3 A
12 A
26 A
88 A
800 V
DC
3 A
12 A
17 A
68 A
900 V
DC
2 A
8 A
12 A
48 A
1000 V
DC
2 A
8 A
6 A
24 A
Number of poles
1
1
2
2
131
EN
Summary of Contents for Symo GEN24 3.0
Page 2: ......
Page 11: ...General information 11...
Page 12: ...12...
Page 31: ...Backup power variant PV Point OP 31...
Page 32: ...32...
Page 34: ...34...
Page 35: ...Installation 35...
Page 36: ...36...
Page 77: ...Settings website of the inverter 77...
Page 78: ...78...
Page 104: ...104...
Page 105: ...Options 105...
Page 106: ...106...
Page 116: ...116...
Page 117: ...Appendix 117...
Page 118: ...118...
Page 132: ...132...
Page 133: ...Circuit diagrams 133...
Page 134: ...134...
Page 135: ...Circuit Diagram PV Point OP Circuit Diagram 135 EN...
Page 136: ...Fronius Symo GEN24 and BYD Battery Box Premi um HV Circuit Diagram 136...
Page 137: ...Wiring diagram surge protective device SPD Circuit Diagram 137 EN...
Page 138: ...138...
Page 139: ...Dimensions of the inverter 139...
Page 140: ...140...
Page 141: ...Fronius Symo GEN24 3 5 kW Fronius Symo GEN24 3 5 kW 141 EN...
Page 142: ...142...
Page 143: ...143 EN...
Page 144: ......