I/O power man-
agement settings
- 1 relay
DNO Rules
V+/GND
IO
I
not used
DNO Feedback
Rule 1
0
2
4
6
8
10
1
3
5
7
9
11
100
DNO Feedback
Active Power
1
cap
Power Factor (cos φ)
Rule 2
0
2
4
6
8
10
1
3
5
7
9
11
0
DNO Feedback
Active Power
1
cap
Power Factor (cos φ)
EXPORT
IMPORT
0
0
2
3
4
5
6
7
8
9
10
11
1
2
4
1
3
5
6
9
11
7
10
8
v
+
v
+
GND
GND
I/O Power Management
None
None
None
None
None
None
None
None
IO control
None
None
None
Autotest
(CEI 0-21)
Description
The 'Autotest' can be used to check the protective function required by the Italian stand-
ard for monitoring the voltage and frequency limits as well as the trip limits of the inverter
during commissioning. During normal operation, the inverter constantly checks the cur-
rent voltage and frequency actual value of the grid.
After the start of the autotest, various individual tests run automatically one after the oth-
er. Depending on grid conditions, the duration of the test is approx. 15 minutes.
IMPORTANT!
The inverter may only be commissioned in Italy after a successful autotest (CEI 0-21). If
the autotest is not passed, no feed-in operation may take place. If the autotest is started
once, it must be completed successfully. The autotest cannot be started during emer-
gency power mode.
VAC inner
limit max
Test to check the maximum voltage in the phases
VAC inner
limit min
Test to check the minimum voltage in the phases
FAC inner
limit max
Test to check the maximum frequency
102
Summary of Contents for Symo GEN24 3.0
Page 2: ......
Page 11: ...General information 11...
Page 12: ...12...
Page 31: ...Backup power variant PV Point OP 31...
Page 32: ...32...
Page 34: ...34...
Page 35: ...Installation 35...
Page 36: ...36...
Page 77: ...Settings website of the inverter 77...
Page 78: ...78...
Page 104: ...104...
Page 105: ...Options 105...
Page 106: ...106...
Page 116: ...116...
Page 117: ...Appendix 117...
Page 118: ...118...
Page 132: ...132...
Page 133: ...Circuit diagrams 133...
Page 134: ...134...
Page 135: ...Circuit Diagram PV Point OP Circuit Diagram 135 EN...
Page 136: ...Fronius Symo GEN24 and BYD Battery Box Premi um HV Circuit Diagram 136...
Page 137: ...Wiring diagram surge protective device SPD Circuit Diagram 137 EN...
Page 138: ...138...
Page 139: ...Dimensions of the inverter 139...
Page 140: ...140...
Page 141: ...Fronius Symo GEN24 3 5 kW Fronius Symo GEN24 3 5 kW 141 EN...
Page 142: ...142...
Page 143: ...143 EN...
Page 144: ......