Contents
Page 4
M1020008_en
s
C
1
General Information
6
1.1
Notes on standards
6
1.2
Design information
7
1.2.1
Approval and obligation to report ...................................................................... 7
1.2.2
Requirements for central heating water ............................................................. 7
1.2.3
Ventilation of boiler room ................................................................................ 7
1.2.4
Installing the heating system / Standards .......................................................... 8
Combination with storage tank ......................................................................... 8
Return feed lift............................................................................................... 8
1.2.5
Chimney connection/chimney system ................................................................ 9
Draught limiter............................................................................................... 9
Boiler data for constructing the flue gas system .................................................. 9
2
Technology
10
2.1
Turbomatic TMC 70-110 dimensions
10
2.2
Components and connections
11
2.3
Technical specifications
12
Test data for operation with wood chips ........................................................... 12
Test data for operation with pellets ................................................................. 13
3
Installation
14
3.1
Transport
14
3.1.1
Positioning................................................................................................... 14
3.1.2
Temporary storage ....................................................................................... 14
3.2
Setting up in the boiler room
14
3.2.1
Removing the boiler from the pallet ................................................................ 14
3.2.2
Moving the boiler in the boiler room ................................................................ 14
3.2.3
Minimum distances in the boiler room.............................................................. 15
3.2.4
General information for boiler room................................................................. 15
3.3
Assembly work
16
3.3.1
Installing the chamber in the boiler ................................................................. 16
Installing fitted screws .................................................................................. 17
3.3.2
Installing the boiler insulation......................................................................... 17
Installing the insulation mounting brackets....................................................... 17
Installing the securing plate and impact plate for the WOS ................................. 18
Installing the insulating side panels................................................................. 18
Installing the front insulating side panels ......................................................... 19
Insulation - installing the chamber .................................................................. 23
3.3.3
Installing the induced draught fan................................................................... 24
3.3.4
Installing the WOS drive ................................................................................ 25
3.3.5
Installing the heat exchanger ash removal unit ................................................. 26
3.3.6
Installing the chamber ash removal unit .......................................................... 27
3.3.7
Installing the combustion air blower fan........................................................... 27
3.3.8
Installing the stoker unit................................................................................ 28
3.3.9
Installing the igniter...................................................................................... 28
3.3.10
Installing the combustion chamber overpressure sensor..................................... 29
Summary of Contents for Turbomatic TMC 100
Page 2: ......