![Froling Turbomatic TMC 100 Installation Instructions Manual Download Page 31](http://html1.mh-extra.com/html/froling/turbomatic-tmc-100/turbomatic-tmc-100_installation-instructions-manual_2338740031.webp)
Installation
Assembly work
Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse 12, A-4710 Grieskirchen
Page 31
Tel +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 [email protected] www.froeling.com
M1020008_en
3
3.3.12
Completing the combustion chamber door
U
Insert flange bushing into door
handle
U
Position the door handle in the hole
provided
U
Fasten the door handle in place
- 1 hexagonal screw M8x30
U
After assembly check that the door
handle operates smoothly
U
Position the safety clamp on the door frame
U
Fix the safety clamp at the top and bottom with rivets and locking
washers
3.3.13
Install the insulating door
U
Insert the sliding bushings into the insulating door mounting
brackets
Both sliding bushings must be tapped in downwards.
Position the insulating door at the mounting brackets and insert the
pre-mounted screws
Summary of Contents for Turbomatic TMC 100
Page 2: ......