![Froling Turbomatic TMC 100 Installation Instructions Manual Download Page 23](http://html1.mh-extra.com/html/froling/turbomatic-tmc-100/turbomatic-tmc-100_installation-instructions-manual_2338740023.webp)
Installation
Assembly work
Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse 12, A-4710 Grieskirchen
Page 23
Tel +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 [email protected] www.froeling.com
M1020008_en
3
Insulation - installing the chamber
U
Remove the protective cap from the ignition pipe
U
Put on the insulation on the stoker side
Ensure that the fitted screws engage correctly in the spring
shackles.
U
Fit the cover plate at the stoker duct with self-tapping screws
U
Put on the insulation on the grate shaft side
Ensure that the fitted screws engage
correctly in the spring shackles.
U
Fit smaller insulation above the actuators
with self-tapping screws
U
Bunch the cables of the units together, pull
them upwards and lay them on the boiler
U
Fit the cable cover with self-tapping screws
U
Attach the front insulation
Ensure that the fitted screws engage
correctly in the spring shackles.
Summary of Contents for Turbomatic TMC 100
Page 2: ......