Installation
Assembly work
Page 14
M1020008_en
s
3
3
Installation
3.1
Transport
The boiler comes in cardboard packaging on 4 pallets together with the
chamber delivery unit.
Move the boiler without jarring or jolting
Follow the transport instructions on the packaging when moving the
boiler.
3.1.1
Positioning
U
Place a fork-lift or similar lifting device with a minimum fork length of
1100 mm and an appropriate load-bearing capacity at the pallet and
position the boiler
If it is not possible to position the boiler on the pallet:
U
Remove cardboard packaging
U
Remove boiler from pallet
À
See 3.2.1 Removing the boiler from the pallet
3.1.2
Temporary storage
If the system is to be installed at a later date:
U
Store the boiler, insulation and control unit in a safe, dust-free, and
dry location
Moisture reduces the effectiveness of the insulation and destroys
electronic components.
3.2
Setting up in the boiler room
3.2.1
Removing the boiler from the pallet
U
Remove 4 screws from the boiler
bottom
U
Lift the boiler off the pallet
3.2.2
Moving the boiler in the boiler room
U
Position a fork-lift or similar lifting device with an appropriate load-
bearing capacity at the base frame of the boiler and lift
U
Set up boiler at intended location
Observe the minimum distances in the boiler room (see 3.2.3).