![Froling Turbomat TM 400 Installation Instructions Manual Download Page 2](http://html1.mh-extra.com/html/froling/turbomat-tm-400/turbomat-tm-400_installation-instructions-manual_2338738002.webp)
Table of contents
Qualification of assembly staff
Protective equipment for assembly staff
General standards for heating systems
Standards for structural and safety devices
Installation and approval of the heating system
General information for installation room (boiler room)
Requirements for central heating water
Notes for using pressure maintenance systems
Chimney connection/chimney system
Boiler data for planning the flue gas system
Moving the boiler in the boiler room
Minimum distances in the boiler room
Bolting together the combustion chamber and heat exchanger
Repositioning the EOS rods (if required)
Assemble the case cooling duct (optional)
Assembling the insulation floor base frame
Fitting thermal insulation to the boiler
Assembling the upper insulation base frame
Installing the insulating side panels
Installing the heat exchanger ash removal unit
Installing the induced draught fan
Mounting the cover on the slide-on duct
Table of contents
2
Fröling GesmbH | 4710 Grieskirchen, Industriestraße 12 | www.froeling.at