![Froling Turbomat TM 400 Installation Instructions Manual Download Page 38](http://html1.mh-extra.com/html/froling/turbomat-tm-400/turbomat-tm-400_installation-instructions-manual_2338738038.webp)
❒ Assemble both ash removal flanges with 4 M8x20 hexagon bolts and M8 spacer
washers
➥ Position the flanges so that the levers on the locking mechanism face outwards
❒ Install the insulation
❒ Mount the lower bracket to the insulation
❒ Position both ash cans on the flanges
➥ Push the lever on the side of the boiler downwards to lock the ash container in
place
Front of boiler
4
Assembly
Installing the boiler
38
Fröling GesmbH | 4710 Grieskirchen, Industriestraße 12 | www.froeling.at