![Froling Turbomat TM 400 Installation Instructions Manual Download Page 37](http://html1.mh-extra.com/html/froling/turbomat-tm-400/turbomat-tm-400_installation-instructions-manual_2338738037.webp)
1
M8x25 hexagonal screw
2
Ash removal flange
3
Disc spring
4
Locking lever
5
Bushing
6
M8 toothed washer
7
M8 safety nut
❒ Assemble the locking lever onto the ash removal flanges as shown in the diagram
❒ Fit the foam rubber seal on the ash removal flanges over the shaft
❒ Fit the plastic handles on the locking levers
➥ If necessary, use a rubber mallet to knock it into place
Assembling the ash
box locking
lever
Assembly
4
Installing the boiler
Installation Instructions Turbomat TM 400-500 | M0690213_en
37