![Froling Turbomat TM 400 Installation Instructions Manual Download Page 23](http://html1.mh-extra.com/html/froling/turbomat-tm-400/turbomat-tm-400_installation-instructions-manual_2338738023.webp)
4.5.6 Assembling the insulation floor base frame
E
A
Left combustion chamber longitudinal
element
E
Front heat exchanger cross-piece
B
Right combustion chamber longitudi‐
nal element
F
Back heat exchanger cross-piece
C
Back combustion chamber cross-
piece
G
Angled elements
D
Front combustion chamber cross-
piece
H
Right heat exchanger longitudinal ele‐
ment
❒ Position the left combustion chamber longitudinal element (A)
Assembly
4
Installing the boiler
Installation Instructions Turbomat TM 400-500 | M0690213_en
23